Similar Projects
CTH B Const / Intersection Modification
Infrastructure
Conception
$250,000 to $499,999 est. value
Oconomowoc, WI 53066

Custer Lane Reconstruction
Infrastructure
Bidding
$300,000 est. value
Lannon, WI 53046

Area 5 and Area 7 Flood Mitigation
Infrastructure
Bidding
$600,000 est. value
Waukesha, WI

2021 Street Maintenance
Post-Bid
Oconomowoc, WI

2021 Road Program
Post-Bid
Brookfield, WI 53045

2021 Street Projects 47
Results
Less than $2,000,000 est. value
Oconomowoc, WI

IH 43, Rock Freeway, 124th Street and 116th Street Br.; IH 43, Rock Freeway, STH 83 to STH 164; IH 43, Rock Freeway, STH 164 to Beloit Road
Results

Crack Filling of Roads (2022)
Infrastructure
Bidding
$140,000 est. value
Waukesha, WI

2021 Road Improvement Program
Post-Bid
Delafield, WI

Lawndale Avenue, Fairmont Avenue and Caldwell Street Utility and Street Improvements
Renovation
Results
Waukesha, WI 53188

Asphaltic Seal Coating of Roads With Black Boiler Slag (2022)
Infrastructure
Bidding
$80,000 est. value
Waukesha, WI

Town Hall Drive Reconditioning
Renovation
Post-Bid
Eagle, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Bidding
$200,000 est. value

Asphalt Concrete Paving - County Highway System
Infrastructure
Post-Bid
WI

Reported 06/04/2022 12:00 AM
Project Title

2022 Pavement Crackfilling

Physical Address View project details and contacts
City, State (County) Waukesha, WI   (Waukesha County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids. Owner to Subcontract by Invitation Only.
Project Status Bidding, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Municipal Agency - 05/20/22
Owner View project details and contacts
Architect View project details and contacts
Description

60,000 LBS of Pavement Crackfilling. Registering as a plan holder is recommended for all prime contractors and subcontractors because plan holders will receive addendums and other contract document updates via QuestCDN. 60,000 LBS of Pavement Crackfilling The work included in this contract for Crackfilling of asphalt streets will consist of and be completed in the following order: o Route all cracks to be filled. Dustless routers will be required. o Clean and dry all routed cracks. o Fill cracks with a pressurized applicator wand. o Clean remaining debris from streets after cracks are filled This work shall be completed on various streets City wide

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents