Similar Projects
New Greenhouse UA Arboretum
Results
Less than $307,000 est. value
Tuscaloosa, AL 35487

Section Street Repair of Existing Greenhouse
Results
Fairhope, AL 36532

Easyvet Clinic
Renovation - 1,345 SF
Construction
Birmingham, AL 35242

New Baldwin County Animal Shelter Intake Building
New Construction - 13,677 SF
Bidding
$3,564,024 est. value
Summerdale, AL 36580

Animal Services Center Renovation Phase 3
Renovation
Results
$1,255,000 est. value
AL 35805

Isolation Kennel for the Mobile County Animal Shelter
New Construction - 1,783 SF
Post-Bid
Mobile, AL 36618

Greenhouses for Bryant
Post-Bid
Tuscaloosa, AL 35403

Nichols Replacement of Three Greenhouses
Post-Bid
Fairhope, AL 36532

Modernize Fish Houses #55 and #59-Auburn, AL
New Construction, Demolition
Results
$500,000 to $1,000,000 est. value
Auburn, AL

Greenhouse Replacement
New Construction
Results
Gulf Shores, AL 36542

Movable Rain-Out Shelters with Automated Retractable Roofs
Alteration
Post-Bid
Auburn, AL

Construct Pole Barn for Aquatics Animal Research Lab, USDA-ArRS, Auburn, Al
New Construction
Results
$25,000 to $100,000 est. value
Auburn, AL 36832

Labor to Assemble and Erect Three Greenhouses
Results
Fairhope, AL 36532

Construction of EDS for Aquatic Animal Research Lab, Auburn, AL
New Construction
Results
Auburn, AL 36832

Last Updated 10/12/2021 03:51 PM
Project Title

Construction of a New Baldwin County Animal Shelter Intake Building

Physical Address View project details and contacts
City, State (County) Summerdale, AL 36580   (Baldwin County)
Category(s) Animal/Plant/Fish Facility
Sub-Category(s) Animal/Plant/Fish Facility
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,564,024
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The site of the proposed work will be located at 15050 County Road 49, Summerdale, AL 36580. The existing facility will be demolished for construction of the new facility. Special care will be taken during the demolition process in order to retain and store select existing facility items per the County’s direction. The new building consists of 13,677 square feet (10,764 square feet heated and cooled.) The work will include, but is not limited to, site and building demolition, site grading, site drainage, concrete slabs and walks, concrete masonry unit structural walls, pre-manufactured wood trusses, metal roof panel system, stucco, cement board trim and soffits, metal stud furr-outs, gypsum board ceilings, acoustic tile ceilings, interior and exterior chain-link fencing, galvanized hollow metal doors and frames, solid core wood doors, specialty kennel equipment, interior epoxy paint and latex paint finishes, plumbing, mechanical, electrical work, and communications rough-in. The work will include all materials, labor, tools, expendable equipment and transportation services, and all incidental items necessary to perform and complete, in a workmanlike manner, the work required to complete the project.

Details

1 Animal/Plant/Fish Facility, 13,677 SF New Construction.
Division 02 - Existing Conditions.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents