Similar Projects
Sand Spring Run Stream Bank Restoration
Design
Stroudsburg, PA

Dunbar Creek Flood Protection Project
Post-Bid
$500,000 to $1,000,000 est. value
Dunbar, PA 15431

Pipe
Post-Bid
Rome, Wysox, PA 18837

Doyle Avenue Landslide Repair
Results
PA

Butternut Lane Culvert Project
Results
Millville, PA 17846

Lake Association Pavilion - Drainage and Landscaping Construction
Post-Bid
Mountain Top, PA 18707

SR 866 Culvert Rehabilitation Project
Results
Williamsburg, PA

Reed Road Culvert Replacement Project
Post-Bid
New Castle, PA 16101

Gettysburg Road Drainage and Widening Project Phase II
Results
Littlestown, PA

Frame, Park Grate
Post-Bid
Philadelphia, PA 19107

Reconstruction of Mckinley Street Wall
Results
Export, PA

Green Forest Drive Culvert Replacement Project
Results
Baden, PA

Scott Township CD 44 7.5 Georges Run Stream Restoration
Results
Pittsburgh, PA

Wakefield Road Drainage Improvements
Results
Less than $147,623 est. value
PA

Hamilton Terrace Drainage and Pavement Improvements Project
Results
Lewistown, PA

Last Updated 10/23/2020 08:56 AM
Project Title

2020 Drainage Improvement Projects

Physical Address View project details and contacts
City, State (County) Mohrsville, PA 19541   (Berks County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under the 2020 Drainage Improvement Projects includes the replacement of culverts on Pony Road and Gin Mill Road. The Pony Road culvert replacement includes removal of the existing Iron Culvert and the installation of a proposed 48” HDPE Culvert. The Gin Mill Road culvert replacement includes the removal of the existing concrete and cast culvert and the installation of a 48” HDPE culvert with a concrete headwall. Both locations also include paving restoration consisting of approximately 40 tons of various bituminous Superpave materials, plus related milling work.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents