Similar Projects
Scott, Yates, Lakeview, and Strong Outfalls at Bayou Texar
Results
Pensacola, FL

Whirlpool Road Dirt Road Paving Driveway Pipe
Post-Bid
FL

Bayou Boulevard, Lee, Lloyd and Stanley Street Outfalls to Bayou Texar Stormwater Treatment Enhancement
Results
Pensacola, FL

Escambia County Waste Services HDPE Line Repair and Maintenance
Results
Less than $55,000 est. value
Cantonment, FL 32533

Alcaniz Street Outfall to Pensacola Bay Stormwater Treatment Enhancement
Results
Pensacola, FL 32502

Fairchild Street Swale Upgrade Project
Results
Less than $122,000 est. value
Pensacola, FL 32504

Sharp Point Beach Nourishment Project
Results
Pensacola, FL

Klondike Road at Cedarbrook Estates Pond
Post-Bid
Pensacola, FL 32526

Pensacola Bay Living Shoreline Greenshores II
Results
Pensacola, FL 32502

Burgess Road Sidewalk & Drainage Improvements
Results
Less than $1,570,000 est. value
Pensacola, FL 32598

Godwin Lane Regional Pond
Results
FL

Crockett Street Drainage Improvements Phase II
Results
Less than $280,000 est. value
FL

Blue Springs Drainage Improvements at Crescent Lake
Results
Less than $373,000 est. value
FL

Clerk Archives Flood Mitigation Project
Results
Pensacola, FL 32501

Washington High School Pond Rehabilitation
Bidding
Pensacola, FL 32504

Last Updated 11/12/2020 02:27 PM
Project Title

Stormwater Ponds Maintenance

Physical Address View project details and contacts
City, State (County) Pensacola, FL 32502   (Escambia County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The current inventory of stormwater treatment units is a combination of wet and dry retention ponds, paved concrete ditches and grassed ditches of varying size. Required services include mowing, minor tree trimming, litter or debris removal, and maintenance of adjacent rights-of-way. Attached is a list of locations of existing stormwater ponds and ditches and the approximate cutting areas. The contractor will be responsible for all traffic control, and for restoration of landscaped areas should their equipment cause any damage. City Public Works staff will assist in defining access points to all treatment units, and verify that the units are cleaned before the contractor will be allowed to proceed to the next location. Payment will be based on unit type and size.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents