Similar Projects
Royal Caribbean Cruise Terminal
New Construction - 170,000 SF
Design
Galveston, TX 77550

Baggage Make-Up Unit Replacement and Baggage Handling System Improvements
Post-Bid
Killeen, TX 76549

Annual Request for Qualifications for future airport-related planning and development projects
Term Contract
Post-Bid

Airport Improvements
Results
Vernon, TX 76384

Terminal D Board Owned Passenger Boarding Bridge Rehabilitation
Renovation
Results
$4,254,000 est. value
Dallas, TX

American Airlines DFW Central Fulfillment Center
New Construction - 394,000 SF
Construction
$10,000,000 CJ est. value
Dallas, TX 75261

Terminal D SV Mezzanine Base Building Corrections
Renovation
Results
$473,795 est. value
Dallas, TX 75261

New Airport Terminal Building – Refugio County
Results
Less than $381,749 est. value
Refugio, TX 78377

Reported 02/01/2020 12:00 AM
Project Title

Terminal A Renovations Phase III, Front Door Modernization

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78205   (Bexar County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value $4,200,000
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The City of San Antonio, Transportation & Capital Improvements Department on behalf of the Aviation Department. Is seeking qualifications and Request for Competitive Sealed Proposals from qualified firm(s) to provide construction services for the Terminal A Renovation Phase III, Front Door Modernization Project. Contractor’s scope of work provides for a front door modernization to be performed at Terminal A and B at the San Antonio International Airport. . Contractor shall be responsible for delivery of scope as defined in 100% complete construction documents and specifications. A brief summary is listed below: 1. Modifications to the roadway passenger loading zones to improve ADA at Terminal A and B. 2. Removal of existing commercial lane awnings and addition of steel & fabric tensile canopies. 3. Demolition and addition of exterior light fixtures at Terminal A and B. 4. Replacement of pedestrian barrier fencing at the commercial sidewalk. 5. Demolition of existing vestibule canopies and roofs at the upper level of Terminal A. 6. Addition of vestibule canopies and roofs at the upper level of Terminal A. 7. Replacement of exterior terrazzo flooring with concrete flatwork at both levels of Terminal A.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents