Similar Projects
Shoulder Widening, Mill, AC Resurfacing, Replace Str Bridge, Approach Grading, Pipework; Signal, Crossing Surface
Infrastructure
Conception
$11,673,000 CJ est. value
Elkton, SD 57026

Shoulder Widening, Mill, AC Resurfacing, Replace Str Bridge, Approach Grading, Pipework; Signal, Crossing Surface
Infrastructure
Conception
$11,673,000 CJ est. value
Elkton, SD 57026

Tall Grass Parkway Multi-Residential Development
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Brookings, SD 57006

Low Slump Dense Concrete Overlay, Approach Slabs, Joints, Bridge Rail, End Blocks - Watertown Area
Infrastructure
Bidding
$1,653,000 CJ est. value
Aurora, SD 57002

Low Slump Dense Concrete Overlay, Approach Slabs, Joints, Bridge Rail, End Blocks - Watertown Area
Infrastructure
Bidding
$1,653,000 CJ est. value
Aurora, SD 57002

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Standing Contract for Excavation Services
Term Contract
Post-Bid
Brookings, SD

Asphalt Surface Treatment
Infrastructure
Results

Street Maintenance and Overlay Project
Infrastructure
Results
$200,000 est. value
Brookings, SD

2022 Bond - Brookings School District
New Construction, Build-out, Infrastructure
Pending Verification
$23,000,000 CJ est. value
Brookings, SD 57006

34th Avenue Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Brookings, SD 57006

City Hall - City of Aurora
Demolition, New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Aurora, SD 57002

South Dakota State University Water Main Replacement
Infrastructure
Post-Bid
$1,690,000 CJ est. value
Brookings, SD 57006

Spot Asphalt Concrete Resurfacing on Various Routes in the Mitchell Area
Infrastructure
Results
$200,000 est. value
Aurora, SD

Morningside Addition
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Brookings, SD 57006

Last Updated 09/27/2023 09:13 AM
Project Title

Mill, AC Resurfacing of Shoulders & Mainline - Watertown Area

Physical Address View project details and contacts
City, State (County) Sinai, SD 57061   (Brookings County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $2,392,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Cold Milling, Asphalt Concrete Resurfacing, Shoulder Surfacing US81 - Fm Arlington to SD28; US14 - Fm 2.4 W of Lake Preston to 3.6 E of Lake Preston; US14, US14 E&W - Fm E Ash St in Arlington S 0.5; SD28 - Fm 7 W of Lake Norden E to US81 Brookings, Hamlin, Kingsbury SWPPP = 14.50 AC Contract Id: 9208 Work Type 5 Length 34.368 Prime Contractors must be prequalified in the work type specified for any bid $250,000 or greater. Contractors may submit questions to the forum until 10:00 am CT on 10/13/2023. Questions and answers may be posted until 10:00 am CT on 10/17/2023 at which time the forum will be closed. SDDOT -07- Mill, AC Resurfacing of Shoulders & Mainline - Watertown Area

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents