Similar Projects
Replace Air Cooled Chiller
Alteration
Bidding
Raleigh, NC

Scott Hall HVAC Upgrades - Phase II
Term Contract
Bidding
$763,000 est. value
Raleigh, NC 27607

Cooling Tower Replacement
Post-Bid
Raleigh, NC 27610

Air Conditioning Equipment
Post-Bid
Raleigh, NC 27603

Chiller Replacement - Lee Hall
Results
Less than $600,000 est. value
Raleigh, NC

HVAC Equipment at North Carolina State Lab of Public Health
Term Contract
Results
Less than $15,986 est. value
Raleigh, NC 27607

Jordan Hall HVAC Renovation
Alteration
Bidding
$700,000 est. value
Raleigh, NC 27695

Heating and Air Equipment
Post-Bid
Raleigh, NC 27603

Fuquay Varina Middle School Chiller Replacement
Results
Fuquay-Varina, NC 27526

Pullen Aquatic Center HVAC Improvements
Post-Bid
Raleigh, NC 27606

HVAC Unit Replacement
Results
Raleigh, NC 27601

Century Station Air Cooled Chiller Replacement
Post-Bid
$25,000 to $100,000 est. value
Raleigh, NC 27601

HVAC Demolition and Installation at Pullen Park Carousel Building
Results
Raleigh, NC 27606

Weatherization Services HVAC, Plumbing, Electrical, Insulation and Air Sealing Contractors
Renovation
Post-Bid

Chiller Installation and Repair
Term Contract
Results
Raleigh, NC 27610

Last Updated 06/22/2021 01:27 PM
Project Title

EM Johnson WTP Recycle Pump Station HVAC Upgrade

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27614   (Wake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF WORK • Demolition Coordinate with the owner prior to turning off the unit. Disconnect power from existing unit and lock and tag out all energy sources. Remove wiring and conduit back to the existing safety disconnect unless otherwise instructed by the owner to leave the existing wiring. Evacuate and decommission the existing unit in accordance with regulatory requirements. The contractor shall dispose of or recycling the decommissioned and removed systems. • Ducting and Air Distribution Re-use existing ductwork. Include any modification necessary to transition and terminate to the existing ductwork. Test and balance each newly installed unit. Perform an air ductwork assessment and if deficiencies found, make recommendations for repairs. Repairs maybe addressed at the owner’s discretion. • Installation Comply with manufacturer’s installation guidelines Install units plumb and level Perform complete installation, start-up, verification, testing and air balancing per manufacturers recommendations. DE Benton WTP – Potassium Permanganate: Abandon the underground refrigerant lines and run new lines overhead. Utilize existing unit-strut racks for pipe wherever possible. • Controls Connect new HVAC equipment to the existing thermostat and/or controls. Only where necessary for compatibility, update the thermostat As needed remove and reinstall existing duct smoke detectors. Notify owner prior to disconnecting or tampering with duct detectors so the alarm system can be placed into maintenance mode • Roof Work to Support HVAC Equipment Changes Include any roof and/or equipment curb work to support the equipment changes. • HVAC Unit General Specifications The replacement units shall be from one of the following manufacturers. FHP Energy System, Carrier, Daikin/Mcquay, Trane or, approved equal. Minimum efficiency shall meet the North Carolina State Building Code

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents