Similar Projects
Fairfax Peak Indoor Ski Resort
New Construction - 500,000 SF
Conception
$10,000,000 CJ est. value
Lorton, VA

Robinson Development Mixed-Use Development
New Construction - 19,000 SF
Conception
Virginia Beach, VA

One Hanover
New Construction, Build-Out, Demolition - 15,000 SF
Design
Fredericksburg, VA 22401

Dash-In #1622 C-Store & Car Wash
New Construction - 6,400 SF
Design
South Riding, VA 20152

Jollibee
Renovation - 2,886 SF
Bidding
$100,000 est. value
Chantilly, VA 20151

Starbucks #7894
Renovation - 1,370 SF
Bidding
Virginia Beach, VA 23452

Biscuitville
New Construction, Demolition - 2,734 SF
Sub-Bidding
Lynchburg, VA 24501

Wendy's
New Construction - 2,091 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Sterling, VA 20166

Target #T1827 - Cafe Remodel
Renovation - 1,100 SF
Post-Bid
Chantilly, VA 20151

Starbucks at Chartway Arena Renovation
Renovation - 1,672 SF
Results
$244,400 to $450,000 est. value
Norfolk, VA

Renovations to Owens Dining Hall - Pops and Sweets
Renovation - 900 SF
Results
Blacksburg, VA

The Mather
New Construction - 686,435 SF
Construction
$500,000,000 est. value
McLean, VA 22102

Chick-Fil-A Drive #01689
Renovation, Addition - 5,054 SF
Construction
Manassas, VA 23960

Shenandoah Valley Organic Packaging Plant Expansion
New Construction - 132,600 SF
Pending Verification
$10,000,000 CJ est. value
Harrisonburg, VA 22802

The Shipyard at 17th Street
Renovation
Pending Verification
$3,000,000 est. value
Virginia Beach, VA 23451

Reported 04/19/2022 03:28 PM
Project Title

Glory Days Grill

Physical Address View project details and contacts
City, State (County) Warrenton, VA 20186   (Fauquier County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method
Project Status Building in Operation as of April 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remodel of an existing restaurant for a new Glory Days Grill.

Details

1 Food/Beverage Service, 6,594 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents