Similar Projects
Last Updated | 07/13/2020 12:57 PM |
Project Title | Condenser Unit Replacement, East Building - General Bids |
Physical Address | View project details and contacts |
City, State (County) | Greenfield, MA 01301 (Franklin County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $220,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | DCAMM Certificate. Removal of four existing R22 condensing units and associated evaporator coils located in existing Air Handling units. All refrigerant appurtenances shall be replaced to allow for compatibility with R410A refrigerant. These units shall be integrated with the existing Metasys Building Automation System, as provided by Johnson Controls. BMS conduit to the condensing units located outdoors is to be removed, replaced, and re-fed with existing controls wiring. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |