Similar Projects
Kensington Tower
New Construction - 680,000 SF
Conception
$10,000,000 CJ est. value
Salt Lake City, UT 84111

Kensington Tower
New Construction - 680,000 SF
Conception
$10,000,000 CJ est. value
Salt Lake City, UT 84111

Cottonwood Mall Redevelopment
New Construction
Design
Holladay, UT 84117

Cottonwood Mall Redevelopment
New Construction
Design
Holladay, UT 84117

Izzy Apartments
New Construction - 37,220 SF
Bidding
$5,000,000 to $10,000,000 CJ est. value
Salt Lake City, UT 84106

Express #437
Renovation - 8,800 SF
Bidding
Murray, UT 84107

Alta Depot
New Construction - 434,303 SF
Sub-Bidding
$10,000,000 CJ est. value
Salt Lake City, UT 84102

Signs.Com Interior Renovation
Renovation - 3,660 SF
Post-Bid
Salt Lake City, UT 84104

Saint Mark`s Tower Window Replacement
Renovation - 89,248 SF
Post-Bid
Salt Lake City, UT

RDA 48th & State Street, Murray City Center District Development
Results
Murray, UT

DFCM Construction-DABC West Valley Store Relocation
Renovation - 14,100 SF
Results
$3,000,000 est. value
West Valley City, UT 84120

The Birdie
New Construction - 72,000 SF
Construction
$17,925,800 est. value
Salt Lake City, UT 84100

Synergy Dance Studio
Renovation - 500 SF
Construction
West Jordan, UT 84081

Retail Shop
Renovation
Pending Verification
Cottonwood Heights, UT

Urban 9th Mixed Use
New Construction - 8,900 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Salt Lake City, UT

Reported 05/28/2021 10:38 AM
Project Title

The Grandeur at Holladay Hills

Physical Address View project details and contacts
City, State (County) Holladay, UT 84117   (Salt Lake County)
Category(s) Commercial, Residential
Sub-Category(s) Apartments/Condominiums, Office, Retail
Contracting Method
Project Status Construction Commenced second quarter 2021, Construction Completion Expected April 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Retail, New Construction, Office, New Construction, 1 Apartments/Condominiums, 5 Stories Above Grade, 120,463 SF Renovation, 201 Unit(s).
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents