Similar Projects
California Waste Solutions Recycling Facility
New Construction - 170,765 SF
Design
$10,000,000 CJ est. value
Oakland, CA 94607

Digester No 4 Coating and Annular Seal Repair
Renovation
Bidding
Sunnyvale, CA 94089

Enhanced Treatment and Site Upgrade - Phase 1A Aeration Basin Modifications
Renovation
Bidding
$63,600,000 est. value
Union City, CA

City Distribution Division Campus at 2000 Marin
New Construction, Demolition
Post-Bid
$225,000,000 est. value
San Francisco, CA 94124

Plant Structural Improvements
New Construction
Post-Bid
$1,805,000 est. value
Modesto, CA 95351

Biosolids Digester Facility - Building 610 Wave 1
New Construction
Results
$939,000,000 est. value
San Francisco, CA 94124

Water Recycling Facility Advanced Water Treatment Facility Project
New Construction, Renovation
Results
$15,000,000 est. value
Santa Paula, CA 93060

EDHWWTP Was Daft Rehabilitation
Renovation
Bidding
$1,500,000 est. value
El Dorado Hills, CA 95762

Biosolids Digester Facilities Project for Building 610
New Construction
Post-Bid
San Francisco, CA

Water Pollution Control Plant Building 042 Primary Clarifier Improvements
Renovation
Results
$6,500,000 to $7,000,000 est. value
San Francisco, CA

Repair and Replace Pumps of Pump Plant in Monterey County
New Construction
Bidding
$5,000 to $333,000 est. value
CA

Southeast Plant New Headworks Construction - Scope III
New Construction
Post-Bid
San Francisco, CA

Install Water/Wastewater Systems and Landscape Work
New Construction
Results
$7,100,000 est. value
CA

Temporary Relief of Waste Water Treatment and Sewage Plant Operator
Renovation
Bidding
Blythe, Chino, Chowchilla, Coalinga, Corcoran, Crescent City, Imperial, Ione, Jamestown, Sacramento, Susanville, Tehachapi, Wasco, CA 91710

Wastewater Treatment Plant Improvement Project
New Construction
Post-Bid
Riverdale, CA

Reported 11/11/2021 12:00 AM
Project Title

Primary Clarifier Rehabilitation No 2 and 4

Physical Address View project details and contacts
City, State (County) Fairfield, CA 94534   (Solano County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $950,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Primary Clarifier Rehabilitation No. 2 and 4 project includes, but is not limited to, a complete mechanical equipment replacement for Primary Clarifier Tank 2 and Primary Clarifier Tank 4, the restoration and coating inside the Primary Effluent Channel, and replacement of Effluent Channel stop gate guide frames located at the Fairfield-Suisun Sewer District.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents