Similar Projects
Pier 4 Culvert and Sinkhole Repairs
Post-Bid
Less than $700,000 est. value
Boston, MA

Black Falcon Cruise Terminal Phase II Seawall Structural Rehabilitation
Results
Less than $2,345,000 est. value
Boston, MA 02210

Coughlin Park Shoreline Stabilization
Post-Bid
$198,850 est. value
Winthrop, MA

Scheduled and Emergency Drainage Repairs and Improvements at Various Locations (including Martha's Vineyard)
Results
Less than $1,163,000 est. value

Retaining Wall Removal and Replacement
Results
Hyde Park, MA 02136

Mills Avenue - Erosion Repair
Results
$40,000 est. value
Revere, MA

Drainage Installation Services
Post-Bid
Boston, MA

Removal and Replacement of 46 Existing Culverts
Post-Bid
Less than $17,400,000 est. value

Long Wharf Seawall Stabilization
Post-Bid
Boston, MA 02110

Catchbasin/Manhole Rehab and Pipe
Post-Bid
Less than $4,300,000 est. value
Boston, MA

Scheduled and Emergency Catch Basin and Drainage System Cleaning at Various Locations in Areas A, B, C and D (Excluding Martha's Vineyard and Nantucket Island)
Results
Less than $1,050,000 est. value

Drainage System Improvements, City-Wide
Results
Less than $192,000 est. value
Boston, MA 02118

Retaining Wall Removal and Replacement and Chain Link Fence Removal and Replacement
Results
Boston, Hyde Park, MA 02136

Scheduled and Emergency Drainage and Erosion Repairs at Various Locations (Including Martha's Vineyard)
Results
Less than $710,000 est. value

Beachmont - Sales Creek Neighborhood Sewer and Drainage Improvements
Results
Less than $630,000 est. value
Revere, MA

Last Updated 02/20/2019 11:31 PM
Project Title

FY 19-21 Small Item Waterfront Repair

Physical Address View project details and contacts
City, State (County) East Boston, MA 02128   (Suffolk County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from State Agency - 01/30/19
Owner View project details and contacts
Architect View project details and contacts
Description Work includes various waterfront repairs, on an as- needed basis, including but not limited to installation, maintenance, and removal of spill containment booms; retrieval and disposal of floating debris; removal and disposal of damaged timber or timber debris; and supply and installation of new timber curbs
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents