Similar Projects
Groundwater Ultraviolet Disinfection Facility - 09-RWS-19 - City of Casper
New Construction, Infrastructure
Conception
$12,000,000 CJ est. value
Casper, WY 82601

N. Poplar Street Storm Sewer Improvements - Phase 1 - 18-Storm-02 - City of Casper
Infrastructure
Conception
$866,000 CJ est. value
Casper, WY 82601

Casper Mountain Trail Center
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Casper, WY 82601

CPR 070 Rehabilitate Runway 8-26
Infrastructure
Bidding
$2,000,000 CJ est. value
Casper, WY 82604

CPR 070 Rehabilitate Runway 8-26
Infrastructure
Bidding
$2,000,000 CJ est. value
Casper, WY 82604

Parking Lot Improvements Tennis Complex
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Casper, WY 82601

Parking Lot Improvements Tennis Complex
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Casper, WY 82601

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

Installation of New Parking Lot Lighting and Enhancement of Current Building Lighting; Air Traffic Control Tower
Infrastructure
Post-Bid
$60,000 CJ est. value
Casper, WY 82604

Casper - Kaycee (Horse Ranch Creek South)
Infrastructure
Results
Casper, Kaycee, WY

Crack Seal
Infrastructure
Results

Natrona County School District Tennis Complex - Early Bid Packages
New Construction, Infrastructure
Construction
$1,000,000 CJ est. value
Casper, WY 82601

Natrona County School District Tennis Courts Complex
New Construction, Renovation, Infrastructure
Construction
$3,750,000 CJ est. value
Casper, WY 82601

Dinosolar Solar Energy System
Infrastructure
Pending Verification
$266,617,340 CJ est. value
Casper, WY 82604

Mountain Acres
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Casper, WY 82601

Last Updated 02/03/2023 09:35 AM
Project Title

Casper/Natrona County International Airport - BLM SEAT Base

Physical Address View project details and contacts
City, State (County) Casper, WY 82604   (Natrona County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $4,800,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Engineers Estimate All Bid Schedules $4,500,000 - $4,800,000 Work generally consists of a new aerial firefighting base of operations for the BLM and includes earthwork, paving, utilities, electrical, a modular operations building, and other site improvements. Casper/Natrona County International Airport board of trustee reserves the right to reject any and or all bids and to waive any informalities if deemed in the best interest of the board. Bid(5%) This project involves the following bid schedules: Schedule 1: New SEAT Base Facility Schedule 2: New SEAT Base (Non-Lease Area) Schedule 3: Existing SEAT Base Cleanup Schedule 4: Operations Building Schedule 5: Reconstruct/Overlay Taxilane Schedule 6: Extra Utility Piping Schedule 7: Concrete Pad Upgrades to Picnic Shelter Schedule 1: New SEAT Base Facility consists of construction of concrete and asphaltic pavement, new trench drains including retardant delivery and retainment system, new storm and sanitary sewer systems, water delivery piping, electrical utilities, a new evaporation pond with lining, installation of a pond aeration system and other items. Approximate quantities include 5 acres of clearing, 8,500 SY asphalt pavement removal, 3,500 CY of excavation, 8,000 CY subbase course, 5,500 CY base course, 3,600 Tons of asphalt mix pavement 1,800 SY of Concrete Loading Pads, 15 Aircraft Tie Downs, 170 LF trench drain with piping, 230 LF of new storm drain with a manhole and inlets, 750 SY of evaporation pond including double lined geomembrane placement, 330 LF of chain link fence with a double swing-gate, 750 LF of new treated water line with various fittings, 675 LF of sanitary sewer line with various fittings and cleanouts, 1000 SF of Temporary and Permanent apron marking, a new picnic shelter and less than an acre of seeding and mulching reclamation. Schedule 2: New SEAT Base Facility (Non-Lease Area) consists of installation of utility installations that tie into the work items of Schedule 1 that occur south of Taxilane B. The utilities include an 8" water main, an 8" sewer main and manhole, telephone, underground power and fiber optic conduits. Schedule 3: Existing SEAT Base Cleanup consists of existing concrete infrastructure demolition, minor excavation and backfill and site cleanup. Schedule 4: Operations building consists of construction of a foundations for a new modular style office building and installation of the modular building Schedule 5: Reconstruct/Overlay Taxilane consists of reconstructing a portion and overlaying a portion of the existing GA Taxilane leading to the new SEAT facility. Approximate quantities include 9,000 SY of asphalt removal, 5,500 CY of excavation, 7,300 SY of subgrade preparation, 2,000 Tons of asphaltic pavement, 400 SF of Temporary and Permanent marking. Schedule 6: Extra Utility Piping consists of installing blank conduit for treated water and sanitary sewer connections to the west of the new SEAT base apron for future development in the infield area. Schedule 7: Concrete Pad Upgrades to Picnic Shelter Consists of constructing a concrete pad under proposed picnic shelter as an upgrade to the proposed 4" of rock (Schedule 1). Schedule 1 - New SEAT Base Facility Place AOA closure barricades in the locations shown on the plans. Construction survey Milling. Excavation and Stockpile Material. Subbase Course. Base Course. Trench Drains. Water Pipe / Line / Valves / Fire Hydrant. Sewer Line and Manhole HMA Paving. PCC Paving. Electrical Conduits. Electrical Improvements. Construct new pond embankment Install new pond liner. Install pond aerator. Install Tie Downs. Construct new security fence. Temporary pavement marking. Cleanup. Schedule 2 - New SEAT Base (Non-Lease Area) Water Pipe / Line / Valves Tap into existing waterline Electrical Conduits. Electrical Improvements Sewer Line / Manhole Schedule 3 - Existing SEAT Base Cleanup Disconnect existing System Demolish existing concrete Minor embankment excavation Schedule 4 - Operations Building Install new modular building foundations Install new modular office building Schedule 5 - Reconstruct/Overlay Taxilane Construction survey. Cold Milling Asphalt Pavement Temporary and Permanent markings Schedule 6 - Extra Utility Piping Blank 8" Treated Water Line w/ connection tie in

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents