Similar Projects
Wisconsin 175 Improvements - Wisconsin Department of Transportation
Infrastructure
Conception
$6,686,850 CJ est. value
Milwaukee, WI 53224

Redevelopment Opportunity - 1214 Milwaukee Avenue - City of South Milwaukee
New Construction, Infrastructure
Conception
$3,474,055 CJ est. value
South Milwaukee, WI 53172

New Milwaukee Public Museum
New Construction, Infrastructure - 230,000 SF
Design
$148,000,000 CJ est. value
Milwaukee, WI 53202

South 13th Street Industrial Building
New Construction, Infrastructure - 191,406 SF
Design
$103,000,000 CJ est. value
Oak Creek, WI 53154

Becher Street Multifamily / Milwaukee
New Construction, Infrastructure
Sub-Bidding
$95,000,000 CJ est. value
Milwaukee, WI 53207

Fox Crossing Cold Spring Road Reconstruction
Infrastructure
Post-Bid
$470,000 CJ est. value
Greenfield, WI 53228

Fox Crossing Cold Spring Road Reconstruction
Infrastructure
Post-Bid
$470,000 CJ est. value
Greenfield, WI 53228

Milorganite Fertilizer Transport and Silo Storage Equipment Replacement at Jones Island Water Reclamation Facility
Renovation
Results
$11,931,000 CJ est. value
Milwaukee, WI 53207

West Plant Return Activated Sludge Channel Repair
Renovation
Results
$1,195,302 CJ est. value
Milwaukee, WI 53207

Eighteen87 On Water Mixed-Use Development
New Construction, Infrastructure - 107,000 SF
Construction
$21,000,000 CJ est. value
Milwaukee, WI 53202

Oakview Parkway Industrial Building
New Construction, Infrastructure - 130,710 SF
Construction
$90,000,000 CJ est. value
Oak Creek, WI 53154

Drew Tower
New Construction, Infrastructure - 80,000 SF
Pending Verification
$50,000,000 CJ est. value
Wauwatosa, WI 53226

Multi-Family Oak Creek Development
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Oak Creek, WI 53154

Jackson Park - W40009 - Milwaukee Metropolitan Sewerage District
Infrastructure
Conception
$41,647,900 CJ est. value
West Milwaukee, WI 53215

Cornerstone Village Wauwatosa
New Construction, Infrastructure - 9,796 SF
Design
$31,000,000 CJ est. value
Wauwatosa, WI 53213

Last Updated 10/18/2023 05:05 AM
Project Title

Digester Sludge Recirculation Pump Replacements at South Shore Water Reclamation Facility

Physical Address View project details and contacts
City, State (County) Oak Creek, WI 53154   (Milwaukee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $284,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Digester Sludge Recirculation Pump Replacements at South Shore Water Reclamation Facility The project contemplated consists of replacement of 10 dry-pit screw-centrifugal digester sludge recirculation pumps and associated equipment. The equipment is located within the Digester Gallery (Building 353) of the South Shore Water Reclamation Facility (SSWRF). The Bid consists of the following work in general: Remove 10 existing digester sludge recirculation pumps, motors, belt drives, and belt drive guards. Store belt drive guards for reuse. Remove and discard existing flexible couplings on suction and discharge pump flanges. Remove digester no. 8 sludge recirculation pump base plate. Furnish and install a new digester no. 8 sludge recirculation pump base plate. Epoxy coat the new digester no. 8 base plate and the remaining nine sludge recirculation pump base plates. Furnish and install 10 new sludge recirculation pumps, motors, and belt drives on the base plates. Reinstall belt drive guards. Furnish and install new flexible couplings on suction and discharge pump flanges and connect to existing piping. Connect new electrical motors to existing electrical supplies. Balance and align the new pumps, motors, and belt drive systems. Complete 7-day test run on each pump. Other work as described in the specifications and as necessary to complete the project.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents