Similar Projects
Cobb 192 - Self-Storage Facility
New Construction - 91,476 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Melbourne, FL

Apollo Crossroads Apartments & Mini-Storage
New Construction
Conception
Melbourne, FL

Lockheed Martin
New Construction, Renovation - 230,993 SF
Design
Titusville, FL

Custom Industrial Products Warehouse
Addition - 20,000 SF
Design
Melbourne, FL

Three Metal Storage Buildings
New Construction
Bidding
$3,000,000 est. value
Rockledge, FL

Chemical Pole Storage Building at Surface Water Treatment Plant
New Construction
Results
$200,000 est. value
Melbourne, FL 32934

Design-Build Hangar C, Office Improvements
Renovation
Results
Sebastian, FL

Rockledge Flats Apartments
New Construction
Construction
Rockledge, FL 32955

Integra Trails Apartment Complex
New Construction - 307,416 SF
Construction
Cocoa, FL 32922

Matador Storage
New Construction - 91,200 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Sebastian, FL 32958

StorSafe of Rockledge
New Construction - 124,000 SF
Conception
Rockledge, FL

U-Haul Self-Storage and Warehouse
New Construction - 60,395 SF
Design
Titusville, FL

Furnish and Install Three-(3) Carport Structures - Water Reclamation
Renovation
Results
$21,000 est. value
Titusville, FL 32780

JP Donovan Office-Warehouse Expansion
Renovation, Addition - 20,550 SF
Construction
$1,800,000 est. value
Rockledge, FL 32955

Wickham Mini Self-Storage
New Construction - 86,430 SF
Design
Melbourne, FL

Last Updated 06/06/2022 03:54 PM
Project Title

DFH3 Melbourne Last Mile Warehouse & Distribution Facility

Physical Address View project details and contacts
City, State (County) Melbourne, FL   (Brevard County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method
Project Status Construction Commenced June 2021, Construction Complete as of second quarter 2022
Bids Due View project details and contacts
Estimated Value $9,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Complex to include Electric Vehicle Charging Yard for up to 737 vans

Details

1 Warehouse/Storage, 1 Story Above Grade, 141,360 SF New Construction, New Construction, 227 Parking Spaces, 66.27 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Battery Equipment, Battery Chargers, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents