Similar Projects
Water System/Plant Improvements - C50105 - State Of Ohio
Renovation
Conception
$7,023,767 est. value
Columbus, OH 43228

New Water Treatment Plant
New Construction
Design
Lancaster, OH

Ottawa County Regional Water Treatment Plant(OCRWTP) - Filter Bed Rehabilitation and Media Replacement Project - Ottawa County
Renovation, Infrastructure
Design
$390,000 est. value
Port Clinton, OH 43452

Water Tower Replacement and WTP Improvements
Renovation
Bidding
$1,067,769 est. value
Hiram, OH

North Water Treatment Plant Replacement
New Construction
Bidding
$10,000,000 est. value
Lancaster, OH 43130

Water Treatment Plant Improvements
Renovation
Post-Bid
Bellaire, OH

Bulk Potable Water Purchase and Ownership, Operation and Maintenance of the Water System
Infrastructure
Post-Bid
Fairport Harbor, OH

Water Treatment Facilities Filter Effluent Valve Replacement
Results
Less than $49,600 est. value
Ironton, OH 45638

Lawrence Street Water Pollution Control Facility Improvements Project
Results
Less than $18,728,560 est. value
Lancaster, OH 43130

Choctaw Lake Water Treatment Plant
New Construction - 2,084 SF
Construction
$1,870,000 est. value
London, OH

2020 Water Treatment Plant
New Construction - 38,800 SF
Construction
$40,570,000 est. value
Marysville, OH

Collins Park Water Treatment Facility Lab Improvements
Infrastructure
Bidding
$1,100,000 est. value
Oregon, OH 43605

Water System Improvements Phase II
Infrastructure
Post-Bid
$549,000 est. value
Windham, OH

Wastewater Treatment Plant Sludge Thickener Rehabilitation
Results
Less than $151,875 est. value
Bellefontaine, OH

Guernsey Street Water Treatment Plant
Construction
Less than $26,973,000 est. value
OH

Reported 07/13/2022 12:00 AM
Project Title

Collins Park Water Treatment Plant Laboratory Improvements

Physical Address View project details and contacts
City, State (County) Toledo, OH   (Lucas County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the Work consists of the furnishing of all labor, material, equipment, etc. for the Collins Park Water Treatment Facility - Lab Improvements including but not limited to the following: 1. First floor scope of work is focused on patching / painting, construction of a high-density file room, new cylinder storage room and new locker installation. 2. Second-floor scope of work is focused on the renovation to the second floor laboratories and their associated support spaces. 3. Work includes general construction, minor mechanical, electrical, plumbing, fire alarm and data cabling. 4. The laboratory casework has been pre-purchased by the Owner and will be onsite and ready for install. The casework and utility installation and coordination is part of this project

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents