Similar Projects
Refurbishment of Pavement Markings
Infrastructure
Bidding
New York, NY

Aluminum Sign Blanks and Sheets
Term Contract
Bidding
NY

Pedestrian Safety Action Plan - Phase III
Post-Bid
Rochester, NY 14614

Aluminum Traffic Sign Blanks
Post-Bid
Plattsburgh, NY 12901

Hangar Door Hazardous Area Marking
Results
Fort Drum, Syracuse, NY 13211

Hangar Door Hazardous Area Marking
Results
Fort Drum, Syracuse, NY 13211

Painting of Traffic Lines
Term Contract
Bidding
NY

Repair, Installation and Supply of Guide Rail
Term Contract
Post-Bid
Carmel, NY 10512

Highway Guide Rail Post Driving Serivces
Term Contract
Results
Utica, NY 13501

Guide Railing Installation
Term Contract
Bidding
NY

Reflectorized Glass Spheres
Term Contract
Post-Bid
Ballston Spa, NY 12020

Traffic Signs
Results
Carmel, NY 10512

Tillson Avenue: Route 44/55(Vineyard Avenue) to Route 9w
Infrastructure
Bidding
Highland, NY 12528

Sign Post
Post-Bid
NY

Aluminum Sign Blanks for 2020
Results
Latham, NY 12110

Reported 02/25/2022 12:00 AM
Project Title

Sagamore Road Retaining Wall

Physical Address View project details and contacts
City, State (County) Bolton, NY 12814   (Warren County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency - 01/31/22
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to the following: Install and maintain necessary traffic control measures. Furnish and install proposed erosion and sediment controls. Drill rock sockets in front of existing stone wall to elevation required for soldier piles. Furnish and install soldier piles to the elevations required. Furnish and install the leveling pad for precast lagging. Furnish and install cast-in-place columns and wall caps. Furnish and install rip rap in front of wall. All remaining work to complete project.

Details

Division 09 - Finishes, Stone Facing, Stone Wall Facing.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Riprap.
Division 32 - Exterior Improvements, Retaining Walls.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents