Similar Projects
East Maricopa Floodway Low Flow Channel
Infrastructure
Bidding
AZ

Roadway, Sewer and Pedestrian Crossing Improvements
Infrastructure
Bidding
Tucson, AZ 85712

Septic Pumping Services for Roper Lake State Park
Demolition
Post-Bid
Safford, AZ 85546

Romero Road Mainline Replacement Project
Post-Bid
Tucson, AZ 85705

R--Bathroom Repairs
Results
Whiteriver, AZ

2020 Bradshaw Rd Sewer Line Replacement
Results
$25,000 to $100,000 est. value
Prescott, AZ 86303

Mandarina Off-Site Water & Sewer
Infrastructure
Construction
Marana, AZ

Mandarina Off-Site Water & Sewer
Infrastructure
Construction
Marana, AZ

Park Plaza Subdivision Sewer Reconstruction
Infrastructure
Bidding
Show Low, AZ 85901

Purchase of Water & Wastewater Works Materials
Term Contract
Post-Bid
Prescott, AZ

Water Main Replacement Program Right-of-Way
Term Contract
Results
Phoenix, AZ 85003

Backflow Assembly Testing, Repair, and Replacement Services
Term Contract
Bidding
Phoenix, AZ

Domestic Water, Fire Protection and Irrigation Systems Improvements
Term Contract
Post-Bid
Yuma, AZ

Bonita Waterline Phase IV and V Cos Project
Results
$2,824,008 est. value
Safford, AZ 85546

BIA Water Systems Improvements at Keams Canyon
Demolition, Term Contract
Bidding
Keams Canyon, AZ 86034

Reported 12/17/2021 01:44 PM
Project Title

Community Water and Wastewater Service for Fayeanne Crook Homesite

Physical Address View project details and contacts
City, State (County) Peach Springs, AZ   (Mohave County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified contractors to install water and wastewater service lines to a residential home on the Hualapai Indian Reservation (Reservation) in Buck and Doe, Arizona. The Contractor shall install 209 feet of one and one half inch water service line with appurtenances and 154 feet of sewer service line as shown on the construction drawings with estimated quantities on the bid schedule.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents