Similar Projects
Three HVAC Units 368 Newfield Ave
Renovation
Sub-Bidding
$500,000 CJ est. value
Bridgeport, CT 06607

Four (4) HVAC Roof Units
Renovation
Sub-Bidding
$500,000 CJ est. value
Bridgeport, CT 06606

Replacement Of HVAC Air Handler & Condenser Units
Alteration
Post-Bid
Stamford, CT 06902

Maintenance, Service and Repairs HVAC and Boiler Systems
Alteration
Post-Bid
Westport, CT 06880

Delivery and Installation of Diesel Exhaust Source Capture System
Alteration
Results
$50,000 est. value
Westport, CT

HVAC Courtyard Piping Project at Scofield School
Alteration
Results
$500,000 est. value
Stamford, CT 06903

Winterization of School Buildings
Renovation
Sub-Bidding
$50,000 CJ est. value
Brookfield, CT 06804

Dust Collection System Upgrades and Related Work
Alteration
Post-Bid
$165,000 est. value
Greenwich, CT 06830

Boiler Replacement at Blackham Elementary School
Renovation
Results
$175,000 CJ est. value
Bridgeport, CT 06606

HVAC Services
Alteration
Post-Bid
Shelton, CT

Chiller Replacement at Westover Elementary School
Renovation
Results
$1,046,130 CJ est. value
Stamford, CT 06902

Heating, Cooling, and Plumbing Services
Alteration
Post-Bid
Greenwich, CT

JFK Pool Boiler Replacement
Renovation
Results
$167,000 CJ est. value
Bridgeport, CT 06610

Vacant Unit Restoration Services
Term Contract
Post-Bid
Danbury, CT 06810

Steam Boiler Purchase & Installation @ Thomas E. Carroll Food & Nutrition Center
Renovation
Results
$56,595 CJ est. value
Bridgeport, CT 06606

Last Updated 10/14/2023 10:07 AM
Project Title

Chiller Replacement - Flood Middle School

Physical Address View project details and contacts
City, State (County) Stratford, CT 06614   (Fairfield County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

1) Project is paid for in part or whole by the State of Connecticut funds provided by the Department of Administrative Services (DAS). 2) Contractors must comply with State Prevailing Fair Wage Provisions (for new construction projects over $1,000,000.00 and remodel/repair projects over $100,000.00 - C.G.S. 31-53(g)). 3) Contractor must comply with DAS Contractor Prequalification requirements, if applicable (i.e. over $1,00,000.00). 4) An Affirmative Action/Equal Opportunity Employer. Minority/Women's Business Enterprises are encouraged to apply Question Deadline 10/16/2023 at 12:00 PM ET Direct requests in writing to: Town of Stratford, Purchasing Department Attention: Phillip Ryan, Purchasing Agent 2725 Main Street, Room 104, Stratford, CT 06615 E-mail: PRyan@townofstratford.com Response will be in the form of an addendum that will be posted approximately Friday, 20th October, 2023 at the close of business to the Purchasing Department website at online A five (5) percent bid bond or equal approved security as stated per the Terms and Conditions must be submitted with the proposal. Any bid submitted without such security will be excluded from the bidding process. No exceptions. The Mayor shall have the power to reject all bids and to advertise again. After Review of All Factors, Terms and Conditions, Including Price, the Town of Stratford Reserves the Right to Reject Any and All Bids, or Any Part Thereof, or Waive Defects in Same, Or Accept Any Proposal Deemed to Be in the Best Interest of the Town of Stratford. The BID BOND furnished, as bid security, must be duly executed by the bidder as principal. It must be in the amount equal to five percent (5%) of the total estimated bid, as guarantee that, in case the contract is awarded to the bidder, the bidder will, within ten days thereafter, execute such contract and furnish a Performance Bond and Payment Bond. Small businesses may elect to obtain an irrevocable letter of credit or cashier's check in lieu of the Bid Bond. Such surety must also be in an amount equal to at least five percent (5%) of the total estimated bid. The successful bidder, within seven (7) business days after notification of award, will be required to furnish Performance and Labor and Material Bond provided by a company authorized to issue such bonds in the State of Connecticut, or Certified Check or properly executed Irrevocable Letter of Credit equal to a hundred per cent (100%) of the award. Chiller Replacement: Flood Middle School 490 Chapel Street Stratford, CT 06614

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents