Similar Projects
Multimodal Improvements 2022/23 - City of Eureka
Infrastructure
Conception
$3,936,420 est. value
Eureka, CA

C Street Bike Boulevard - City of Eureka
Infrastructure
Conception
Less than $1,939,000 est. value
Eureka, CA 95501

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Storm Damage Repair to Eel Rock Road (7D010) PM 0.50, 0.60, 1.90
Infrastructure
Bidding
$578,780 est. value
Myers Flat, CA 95554

Storm Damage Repair to Ettersberg Road (5B010) PM 5.0- 5.6, 5.25
Infrastructure
Bidding
$395,590 est. value
Garberville, CA 95542

Trinidad Fire Station - Paving Services
Infrastructure
Post-Bid
Trinidad, CA 95570

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Bald Hills Road Resurfacing Project
Infrastructure
Results
Hoopa, CA 95546

RHMA-G and HMA
Infrastructure
Results
$26,000,000 est. value
CA

Elk River Interpretive Center - City of Eureka
Alteration
Conception
$3,500,000 est. value
Eureka, CA

Arcata Storage Tank-1C Project
Infrastructure
Bidding
$2,200,000 to $2,700,000 est. value
Arcata, CA 95521

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Precoated Aggregate, Replace AC Surfacing, and Asphalt-Rubber Binder
Infrastructure
Results
$2,250,000 est. value
CA

Commercial Street Fueling Facility - City of Eureka
Infrastructure
Conception
$700,000 est. value
Eureka, CA 95501

Roadway Excavation; Asphalt Treated Perm. Base and HMA(Gap Graded)
Infrastructure
Bidding
$6,100,000 est. value
Fortuna, CA 95540

Reported 06/28/2022 03:43 PM
Project Title

Bay to Zoo Trail - City of Eureka

Physical Address View project details and contacts
City, State (County) Eureka, CA 95501   (Humboldt County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025
Bids Due View project details and contacts
Estimated Value $5,973,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Class 1 bike trail that will connect the City neighborhoods of Myrtle, McFarlan, Buhne, Harris, and Sequoia Park to the Waterfront Trail at Tydd St. As of June 27, 2022, this project is currently in the FY 2022-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents