Last Updated | 03/22/2023 03:34 PM |
Project Title | Demolition and Site Clearing of 1575 Route 47 |
Physical Address | View project details and contacts |
City, State (County) | Woodbine, NJ 08270 (Cape May County) |
Category(s) | Single Trades |
Sub-Category(s) | Environmental |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected April 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of March 20, 2023, project is cancelled. A timeline for the rebid has not yet been established. Demolition and Site Clearing of 1575 Route 47 - The County of Cape May is requesting bids for the demolition and site clearing of the former El Dorado Motel, Block 54 Lot 11, 1575 Route 47 South, Woodbine in the Township of Dennis, NJ. Questions regarding these specifications must be directed in writing to Allison L. Hansen via email at allison.hansen@co.cape-may.nj.us. The deadline for questions is THURSDAY, MARCH 16th, 2023 @ 12:00 P.M., NOON. Demolition: a. Complete demolition and removal of all structures, contents, foundations, piping, mechanical and electrical equipment, and underground utilities (water, wastewater, electrical, etc.). b. Complete demolition and removal of all above and below ground structures; including, but not limited to trees/stumps, concrete slabs and curbs, and landscaping. c. All trees and their stumps are to be removed-extracted from the soil, NOT ground/shredded in place, holes filled with topsoil, graded level, and grass seeded. d. All material, equipment, rubble, debris, and other products of the demolition shallbecome the property of the Contractor for their disposal off-site in accordance with all applicable laws and ordinances. Any sale ofsalvageable materials by the Contractor shall only be conducted off-site. e. The Contractor is responsible to determine the extent of the work required and to verify the accuracy of the property/demolition site. f. The Contractor shall fill and compact all voidsleft by the removal of trees, stumps, pipes, structures, etc. with clean material and a grade consistent with the surrounding area. g. Concrete must be separated from non-recyclable material and taken to a licensed recycling facility. h. Any hazardous materials encountered during demolition must be disposed of in accordance with applicable regulations at the appropriate facility. Notify the Director of.Facilities & Services or designee immediately or as soon as practicable thereafter if hazardous material(s), not previously identified, are found. i. Work is not permitted on Sundays or Holidays. Contractor is responsible for complying with any existing local noise/disturbance regulations. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |