Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Westside WWT Backflow Prevention Improvement
Infrastructure
Bidding
Vancouver, WA 98660

Tukwila Macadam Road South Water Main Upgrade and Sidewalk Improvements
Infrastructure
Bidding
Tukwila, WA 98178

Louis Thompson Tightline
New Construction, Infrastructure
Post-Bid
$5,800,000 est. value
Sammamish, WA 98074

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

Water Meter Changeout
Infrastructure
Results
WA

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Pending Verification
Spokane, WA

West Scott Avenue and Davidson Avenue BNSF Water Main Crossings
Infrastructure
Bidding
$850,000 est. value
Woodland, WA 98674

Reservoir Transmission Main Replacements
Alteration
Post-Bid
Douglas, Wenatchee, WA

Lead Service Line Replacement
Alteration
Results
$4,600,000 to $5,800,000 est. value
Auburn, WA 98092

Deduct Meter Replacement Phase 3
Infrastructure
Bidding
$525,000 to $625,000 est. value
Auburn, WA

Sedgwick Road Watermain Relocation
Infrastructure
Post-Bid
Port Orchard, WA

164th Street SW Transmission Main Connection
Infrastructure
Results
$10,000,000 to $12,000,000 est. value
WA

Water Main Improvements
Infrastructure
Bidding
$1,740,000 est. value
Yelm, WA

Last Updated 12/08/2021 11:46 PM
Project Title

Tulalip Water Pipeline Mortar Repair

Physical Address View project details and contacts
City, State (County) Everett, WA 98201   (Snohomish County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work being performed includes, but is not limited to, furnishing all labor, materials and equipment necessary to repair field-applied joint mortar on approximately 157 pipe joints in approximately 6200 feet of 48” diameter steel pipe with welded lab joints. The Contract also allows for up to 500 feet of crack repair in the factory-applied cement mortar lining, as needed.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents