Similar Projects
Public Works Resurfacing Group 2
Infrastructure
Bidding
SC

2020 Greenway Resurfacing
Results
North Augusta, SC 29841

Rehabilitation - S-5 Aiken Co
Results
SC

Corridor Improvement - SC 118 (Hitchcock Parkway)
Results
SC

Rehabilitation - Aiken County
Results
SC

Preservation- Aiken County
Results
SC

Road Pavings In Wagener, Salley, Springfield
Results
Less than $1,808,733 est. value
Aiken, SC

2021 Asphalt Track Resurfacing at Paul Knox Middle School
Results
North Augusta, SC 29841

Rehabilitation - Aiken Co
Infrastructure
Results
SC

Intersection Improvements - US 278
Infrastructure
Results
SC

Ballard Drive Paving
Infrastructure
Results
$673,651 est. value
Aiken, SC 29847

Safety Improvements
Infrastructure
Results

USC Aiken Convocation Center Parking Lot Coating and Stripe
Infrastructure
Results
$100,000 to $150,000 est. value
Graniteville, SC 29829

Preservation - District 7
Infrastructure
Results

Safety Improvements - District 7
Infrastructure
Results

Last Updated 01/12/2022 07:27 AM
Project Title

Rehabilitation - Aiken County

Physical Address View project details and contacts
City, State (County) SC   (Aiken County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds and Insurance 1.000 Ls Construction Stakes, Lines & Grades 1.000 Ea Traffic Control 1.000 Ls Removal & Disposal of Existing Pavement 925.000 Sy Unclassified Excavation 970.000 Cy Borrow Excavation 5,382.000 Cy Excavation for Shoulder Paving 589.248 Sta Hauling of Excavated Shoulder Material 589.248 Sta Cement Modified Recycled Base (10" Unif)-curing Method B 136,020.000 Sy Portland Cement for Cement Modified Recycled Base Course 4,760.000 Ton Maintenance Stone 17.000 Ton Hma Shoulder Widening Course 2,800.747 Ton Liquid Asphalt Binder Pg64-22 2,821.796 Ton Full Depth Asph. Pav. Patching 6" Unif. 1,460.000 Sy Full Depth Asph. Pav. Patching 8" Unif 240.000 Sy Milling Existing Asphalt Pavement 1.5" 41,630.000 Sy Milling Existing Asphalt Pavement 2.0" 4,600.000 Sy Milling Existing Asphalt Pavement (Variable) 22,675.000 Sy Milled-in Rumble Strip 29.240 Mi Hot Mix Asphalt Surface Course Type C 26,904.083 Ton Hot Mix Asphalt Surface Course Type D 12,798.310 Ton Driveway Paving-surface Type D 2,383.125 Ton Permanent Construction Signs (Ground Mounted) 7,224.000 Sf 4" White Broken Lines(Gaps Excl.)perm.pvmt.marking 790.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Perm.pvmt.marking 214,140.000 Lf 8" White Solid Lines Perm.pvmt.markings 332.000 Lf 24" White Solid Lines (Stop/diag Lines)-perm.pvmt.marking 3,163.000 Lf White Single Arrows (Lt, Strght, Rt) Perm.pvmt.marking 8.000 Ea White Word Message "Only" -perm.pvmt.marking 3.000 Ea White Combination Arrows(Str&rt.or Str<)perm.pvmt.marking 4.000 Ea 4" Yellow Broken Lines(Gaps Exc)perm.pvmt.marking 9,160.000 Lf 4" Yellow Solid Lines(Pvt.edge Lines) Perm.pvmt.marking 167,930.000 Lf 4" White Broken Lines -(Gaps Excluded)-fast Dry Paint 1,282.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-fast Dry Paint 527,280.000 Lf 8"White Solid Lines(Crosswalk&channelization)fast Dry Paint 664.000 Lf 24" White Solid Lines (Stop/diagonal Lines)-fast Dry Paint 6,278.000 Lf White Single Arrow (Left, Straight, Right)-fast Dry Paint 8.000 Ea White Word Message "Only"-fast Dry Paint 3.000 Ea White Combination Arrow(Str.& Rt.or Str.& Lt.)fast Dry Paint 4.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 23,340.000 Lf 4"Yellow Solid Line(Pvt.edge&no Passing Zone)-fast Dry Paint 408,110.000 Lf 6" Yellow Solid Line on Curb/median - Fast Dry Paint 150.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Epoxy Paint 360.000 Lf 4"Yellow Solid Lines-pvt.edge&no Passing Zone - Epoxy Paint 360.000 Lf Permanent Clear Pavement Markers- Mono-dir.- 4"X4" 14.000 Ea Permanent Yellow Pavement Markers Bi-dir.- 4"X4" 2,012.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 40.000 Lf Furnish & Instl No. 14 Copper Wire,1-conductor for Loop Wire 2,130.000 Lf Sawcut for Loop Detector 710.000 Lf Adjust Drop Inlet Adjust D. I. 13.000 Ea Detectable Warning Material 462.500 Sf Pedestrian Ramp Construction 925.000 Sy Surface Applied Detectable Warning 230.000 Sf Remove & Dispose Semi-rigid Gr Device 100.000 Lf Mt3 Leading End Treatment Tl3 2.000 Ea Premash Thrie With Base Pl 6.25 Space 60.000 Lf Premash W-beam Compressed Shldr 9' Post 225.000 Lf Mtbbc3 Mash Thrie-beam Barrier Connector Tl3 2.000 Ea Premash Type T Tl3 Leading 50' 4.000 Ea Permanent Grassing for Non-permitted Resurfacing Projects 27.479 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents