Reported 12/11/2021 12:00 AM
Project Title

AMR-AMI Water Meter Replacement Project

Physical Address View project details and contacts
City, State (County) Louisburg, NC   (Franklin County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Franklin County, NC is seeking Proposals for removal of water service meters 2” and less in diameter which are manual meter reading, totaling approximately 8,750 active accounts with new water meters and meter reading systems. The new meter system should use a hybrid of both Automatic Meter Reading (AMR) drive-by and Advanced Metering Infrastructure (AMI) fixed-base technologies. The AMI fixed-base technology portion of the AMR-AMI Water Meter Replacement Project (Project) shall be within a specified geographic boundary within the Franklin County service area. The meters outside of the AMI boundary will utilize AMR radio-read meters and will be migratable to AMI technology in the future. The new AMR-AMI system will include all necessary hardware and software for reading meters and creating billing files and will be integrated with existing billing systems and processes.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents