Similar Projects
Last Updated | 10/03/2023 11:27 AM |
Project Title | Station #3, #4 (Apparatus Bay Only) and #5 Roofing |
Physical Address | View project details and contacts |
City, State (County) | Cottleville, MO 63366 (Saint Charles County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The successful bidder must be bonded, hold liability insurance, and workman's compensation insurance to protect their employees. Bids shall include not less than the prevailing hourly wage rate determined by the Missouri Department of Labor. Bid shall include how soon work can begin and the amount of time required to complete all work. The O'Fallon Fire Protection District hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, minority business entities will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for award. BID PACKETS must be fully completed and the entire packet returned with bid proposal. 2023-003 1. Remove and dispose of existing roofing down to the structural wood deck and haul away debris. Patrol area for nails. 2. Pricing per board for any damaged boards that may need replacing. 3. Furnish and install ice and water shield on all rake, valleys, and eaves. 4. Furnish and install 30 lb. felt over entire roof surface. 5. Furnish and install 30 year architectural shingles per manufacturer's specifications. Specify name of manufacturer (Brand). 6. Furnish and install all drip edge metal, step flashing, and copings. 7. Reuse existing curb flashing unless replacement is required to ensure water tight conditions. 8. Completion & Cleaning: On completion of the Work, ensure entire site is free of nails; ensure all debris is removed, and leave the Work Area site in a condition acceptable to the Fire District. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |