Similar Projects
208th Street East/Mountain Highway Extension - Pierce County
Infrastructure
Conception
$10,598,000 est. value
Spanaway, WA 98387

Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Septic System for Individual Homeowner in Skagit County
Infrastructure
Design
$25,000 to $100,000 est. value
Sedro-Woolley, WA 98284

Fruit Valley Modernization
New Construction, Alteration
Bidding
$3,000,000 est. value
Vancouver, WA 98660

Parcel 15 Precast Storm Water Vaults
Infrastructure
Bidding
$50,000 to $65,000 est. value
Tacoma, WA

Rainier Beach High School - Bid Package 10 - Earthwork and Utilities
Infrastructure
Sub-Bidding
Seattle, WA 98118

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

Reservoir Transmission Main Replacements
Alteration
Post-Bid
Douglas, Wenatchee, WA

Water Meter Changeout
Infrastructure
Results
WA

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

Lake Washington Ship Canal Water Line Replacement
Infrastructure
Bidding
$100,000 to $250,000 est. value
Seattle, WA 98107

Sedgwick Road Watermain Relocation
Infrastructure
Post-Bid
Port Orchard, WA

Louis Thompson Tightline
New Construction, Infrastructure
Results
$5,800,000 est. value
Sammamish, WA 98074

Rehab Campground Water System Olympic National Park
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
Port Angeles, WA 98362

SR 224 Van Giesen Improvement Phase One
Infrastructure
Post-Bid
West Richland, WA

Reported 07/09/2022 12:00 AM
Project Title

Fuller Creek Water Line Crossing

Physical Address View project details and contacts
City, State (County) Aberdeen, Elma, WA 98541   (Grays Harbor County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of rep lacmg approximately 620 linear feet of 6-mch water main line that crosses Fuller Creek via horizontal directional drilling, at the Satsop Business Park

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents