Similar Projects
China Poot Bay Lodge and Restaurant / Homer
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Homer, AK 99603

Terminal Road And Parking Lot Improvements - City of Kenai
Infrastructure
Conception
$1,750,000 CJ est. value
Kenai, AK 99611

Gravel CIP - Sport Lake Road / Hakala Drive / Cotman Court
Infrastructure
Bidding
$150,000 CJ est. value
Soldotna, AK 99669

Sewer System Installations
Infrastructure
Bidding
$200,000 CJ est. value
Kenai, AK 99611

RFP Design - Achemak Selo School Schematic Design
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Fritz Creek, AK 99603

Central Emergency Services Arc Loop Training Pad Expansion
Infrastructure
Post-Bid
Kalifornsky, AK 99669

2021 Kenai Municipal Airport Airfield Drainage
Infrastructure
Results
Kenai, AK

2021 Bryson Avenue Bluff Erosion Repair
Infrastructure
Results
Kenai, AK 99611

New Multi-Purpose Community Center - City of Homer
New Construction, Infrastructure
Pending Verification
$23,044,210 CJ est. value
Homer, AK 99603

Apron And Willow Street Extension - City Of Kenai
Infrastructure
Conception
$2,350,000 CJ est. value
Kenai, AK 99611

RFQ D/B - HERC 2 - Hazardous Materials Abatement
Term Contract, Infrastructure
Bidding
$260,000 CJ est. value
Homer, AK 99603

Polychrome Area Improvements
Alteration
Post-Bid
$35,000,000 to $45,000,000 est. value

Nanwalek-Port Graham Airport Relocation Drilling Services
Term Contract, Infrastructure
Results
$1,000,000 to $2,500,000 est. value
AK

Lilac Street Repairs - City Of Kenai
Infrastructure
Conception
$393,000 CJ est. value
Kenai, AK 99611

Homer Harbor Float Cathodic Protection Project
Infrastructure
Bidding
$1,500,000 CJ est. value
Homer, AK 99603

Last Updated 09/12/2022 02:06 PM
Project Title

Salmon Creek Channel Excavation and Embankment Maintenance

Physical Address View project details and contacts
City, State (County) Seward, AK 99664   (Kenai Peninsula County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the following: Restoration of the Salmon Creek channel and diversion embankment. Heavy equipment will be used to extract unclassified excavation material from the active channel of the creek along 1,250 feet in length. The gravel embankment will be restored along 1,250 feet of project right from station 15+50-28+00. The channel will be excavated and embankment restored as designed in the SewardBear Creek Flood Service Area Salmon Creek Channel Survey & Extraction Design 2021 plans. Q & A: March 31, 2022 BY 5:00 PM This contract is subject to the provision of State of Alaska, Title 36, Minimum Wage Rates. The subsequent contract will require certificates of insurance and may require performance and payment bonds.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents