Similar Projects
Small Structure Pipe Lining
Bidding
IN

Bridge Replacement and Bank Stabilization in Brookshire Golf Club
New Construction
Bidding
Less than $1,000,000 est. value
Carmel, IN

I Beams 6X9x20
Post-Bid
Indianapolis, IN 46077

Joint Sealing System
Post-Bid
Indianapolis, IN 46077

Community Crossing Street Resurface Program
Results
Lake Station, IN 46405

Bridge Thin Deck Overlay
Results
IN

Karst Farm Trail
Bidding
Bloomington, IN

Ready Mix
Post-Bid
Indianapolis, IN 46204

Bridge Deck Replacement
Results
IN

Studebaker Park Asphalt Path
Bidding
Elkhart, IN 46516

2020 Mill, Patch, and Resurface Roadway Maintenance
Post-Bid
Avon, IN 46123

IDIQ, Patch and Rehab Pavement
Results

Bridge 174 and 175 Replacement
New Construction
Bidding
Lebanon, IN

Cowan Road Widening
Post-Bid
Muncie, IN 47305

Deep River Rock Riffle Improvements
Renovation
Results
Lake Station, IN 46405

Reported 12/16/2020 12:00 AM
Project Title

Intersection Improvement and Small Structure Replacement

Physical Address View project details and contacts
City, State (County) Queensville, IN   (Jennings County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Planning to undertake an intersection improvement and small structure replacement project, funded in part by the Federal Highway Administration. The project is located on SR and begins approximately 500 feet south of County Road (CR) 275 West and extends north 0.57 mile terminating approximately 300 feet orth of CR 300 W in Queensville, Jennings County, Indiana. The proposed project would involve intersection improvements on SR 7 at the intersections of CR 275 W, Country Squire Boulevard, and the entrance to Dollar General Store. Additionally, the vertical alignment of SR 7 would be adjusted to meet stopping sight distance standards for a 50-mph design speed. Drives along the corridor would have their approaches adjusted to accommodate the change in vertical alignment and to meet acceptable INDOT standards. The intersection of SR 7 and CR 300 W would be reconstructed to tie into the proposed vertical profile of SR 7.Pavement would be replaced or rehabilitated if feasible within project limits.As part of the proposed intersection improvements, CR 275 W would be closed to SR 7 and a cul-de-sac constructed on the roadway.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents