Similar Projects
Last Updated | 10/06/2020 02:36 PM |
Project Title | Construction Manager at Risk Services for Various Park Improvement Projects |
Physical Address | View project details and contacts |
City, State (County) | Pompano Beach, FL 33060 (Broward County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1 – Anne Gillies Park Renovations (estimated construction $1.25 million). All work is expected to be completed in one phase. 2 – The Backyard estimated construction $1.25 million. All work is expected to be completed in one phase. The intent of this Solicitation is to select the most qualified firm based on selection committee recommendations and CRA Board approved ranking, with whom to negotiate a Guaranteed Maximum Price (GMP) Agreement and enter into a Construction Manager at Risk (CMAR) Contract to carry out Construction Manager at Risk (CMAR) duties to the anticipated Scope of Services may include, but is not limited, to the following: • Working side-by-side with professional design team during the design stages. CMAR will be tasked to review plans at 75%, 90% and 100% to ensure constructability, adequacy of pricing and materials, preparation of project schedules, conducting feasibility analyses, assisting with site plans and/or design alternative and recommendations and preliminary cost estimates leading to a Guaranteed Maximum Price (GMP). Contractor shall help Identify any design restrictions that could affect the overall design and intent of the project(s). • Preparation of a detailed cost estimate at the 90% design to confirm initial budget allocations and/or to seek CRA’s advice before proceeding with final designs. The firm will be responsible for cost controls throughout the design and construction project except for design and construction elements added or deleted by an expressed CRA directive. • CMAR may be asked to participate in presentations to elected officials, advisory boards,staff, and the public. • CMAR shall work with design team members to prepare all required bidding and construction documents for final permitting. • CMAR will prepare bidding packages and secure no less than three (3) proposals for work not conducted by own workforces. • Attendance at CRA Board, Advisory Committee meetings, and public meeting will be required. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |