Similar Projects
Dormitory C Luxury Vinyl Tile Flooring Installation
Alteration
Post-Bid
$200,000 est. value
Lorman, MS 39096

Olive Branch High School Flooring Project
Alteration
Results
Olive Branch, MS 38654

Southaven Middle School Gymnasium Floor Replacement
Renovation
Results
$193,000 CJ est. value
Southaven, MS 38671

JTVE 222704 - Building 146 Flooring
Renovation
Post-Bid
$100,000 CJ est. value
Gulfport, MS 39507

Gulfport Terminal (GPT) Flooring Replacement Project
Renovation
Post-Bid
$700,000 CJ est. value
Gulfport, MS 39501

Tile Flooring Replacement
Renovation
Post-Bid
$627,237 CJ est. value
Gulfport, MS 39501

Floor Tile Replacement (Modular Buildings)
Alteration
Post-Bid
$40,000 est. value
Jackson, MS

Floor Tile Replacement South Jackson Head Start Center
Renovation
Post-Bid
$200,000 CJ est. value
Jackson, MS 39212

Floor Tile Replacement St. Thomas Head Start Center
Renovation
Post-Bid
$60,000 CJ est. value
Bolton, MS 39041

GLCSD ESSER Program Flooring Improvements Greenwood Leflore Consolidated School District
Renovation
Results
$875,000 CJ est. value
Greenwood, MS 38930

Flooring Replacement at Mosley
Renovation
Post-Bid
$70,000 CJ est. value
Starkville, MS 39759

Last Updated 10/17/2023 10:11 AM
Project Title

Amory High School Gym Wood Floor Replacement

Physical Address View project details and contacts
City, State (County) Amory, MS 38821   (Monroe County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

GENERAL INFORMATION A. Should a bidder find discrepancies in or omissions from the drawings or specifications or be in doubt as to their written meaning, the bidder should immediately notify the Architect who will then send a written instruction or interpretation to all known holders of the documents. Neither the Owner nor the Architect will be responsible for oral instructions or any other communications not included in the documents or addenda. B. It is understood and agreed that refinement and detailing of the drawings and specifications will occur from time to time. No adjustment in the contract sum or completion date shall be made unless such refinement results in changes to the scope, quality, or function of the work not reasonably inferable or anticipatable. Notwithstanding anything contained in this Contract to the contrary, the Contractor will receive no increase in the contract sum based on the increased cost of the work resulting from change orders or increased cost of any allowance items unless the change required is beyond the scope of the work. C. The Contractor shall not use in the project any new materials containing asbestos, asbestos products, polychlorinated biphenyl (PCB), or other toxic substances. If the Contractor discovers that such substances as described herein have been specified or do exist in the project, the Contractor shall promptly notify the Architect in writing and make substitutions for these products at no cost to the Owner

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents