Project Title | Upper Main Street Improvements |
Physical Address | View project details and contacts |
City, State (County) | Park City, UT 84060 (Summit County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,168,796 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The engineers estimate is between $1M - $1.5M PCMC will be improving Main Street between Swede Alley and Hillside Avenue; this project includes removal of existing sidewalks, curb & gutter (C&G), and existing driveways, and installation of wider sidewalks, new pedestrian crosswalks, new C&G, new flatwork, and reconstructed driveways at residential and commercial accesses. This project also includes milling existing asphalt and overlaying the pavement section. Stamped concrete will be installed to better delineate the change in zoning at 75 Main Street. New signage and striping will be installed as well as conduit for future lighting. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |