Similar Projects
UFSA Flooring - Stations 106 and 252
Bidding
Eagle Mountain, Salt Lake City, UT 84005

UFSA Flooring - Stations 106 and 252
Bidding
Eagle Mountain, Salt Lake City, UT 84005

Midway City Town Hall and Community Center Flooring
Post-Bid
Midway, UT 84049

Wilsonart Solid Surface Sheets
Term Contract
Post-Bid
Farmington, UT 84025

Roof Replacement and Flooring Replacement
Results
Provo, UT

Athletic Flooring, Weight and Fitness Equipment and Golf/Multi-Sport Simulator for Ben Lomond High School Athletic Center
Results
Ogden, UT 84404

Fair Grounds
Bidding
Paragonah, UT 84760

Hospital Kitchen Flooring Replacement, Building 522
Post-Bid
Less than $358,562 est. value
Salt Lake City, UT

Floor Finish (2020)
Results
Alpine, UT 84042

Edge of Cedars Visitors Center Carpet
Bidding
$148,000 est. value
Ballard, UT

Correctional Facility Kitchen Floor Solution
Post-Bid
Ogden, UT 84401

SSD Gym Floor Refinish
Results
$20,000 to $30,000 est. value
Richfield, UT 84701

Construction Job Notice: Floor Coverings, South Kearns and Roosevelt Schools
Post-Bid
Kearns, UT 84118

Mill Creek Sediment Basin Concrete Floor Project
Results
Farmington, UT 84025

Statewide Flooring and Installation
Post-Bid
Salt Lake City, UT 84114

Reported 08/07/2020 12:00 AM
Project Title

Tiling of Bathrooms for State Hospital

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84114   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Tile Floor Of Shower Stalls (2 Stalls- Girls Dorm- Pediatric Building) Tile Floor Of a Shower Stall(L Stall-forensic Area II) Tile Floor Of a Restroom/shower Stall (1 Stall- F-5) We need to replace the tile floors in 4 shower stalls at our facility. Room #347 and #329 in the Girls dorm of the Pediatric Building. The other shower stall floor is in room #235 on Area II of the Forensic Building. The fourth floor islocated in our Rampton II building on the Forensic% unit room# 1927. The existing tile will need to be removed as well as the bottom row of tile on the shower walls. A new pan will need to be added and the floor will need to be graded to slope to the drain. The walk-in door entrance to the shower will need to have a tiled lip across the entrance to retain excess water.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents