Similar Projects
Fernald Avenue from Dixfield Drive to Lochwood Boulevard - City of Dallas
Infrastructure, Alteration
Conception
$350,032 est. value
Dallas, TX 75218

Frances Rizo Park Improvements - City of Dallas
Infrastructure
Conception
$180,000 CJ est. value
Dallas, TX 75212

Mockingbird Lane Office Development
New Construction, Infrastructure - 150,000 SF
Design
$32,000,000 CJ est. value
Dallas, TX 75235

Maple Avenue Apartments
New Construction, Infrastructure
Design
$3,600,000 CJ est. value
Dallas, TX 75235

Skyline at Cedar Crest South
New Construction, Infrastructure - 2,800 SF
Bidding
$475,000 CJ est. value
Dallas, TX 75216

Salad and Go #1447 - Marsh & Beltline / Addison
New Construction, Infrastructure - 940 SF
Bidding
$300,000 CJ est. value
Addison, TX 75001

Replacement of Fire Station 41
New Construction, Infrastructure - 8,248 SF
Post-Bid
$4,208,000 CJ est. value
Dallas, TX 75230

Rebuild Chlorine Room at North Main Elevated Storage Tank
Renovation
Post-Bid
$135,000 to $140,000 est. value
Duncanville, TX

World-Wide Water Storage Tank Remediation
Term Contract
Results

Sherwood Wastewater Lift Station & Various Upgrades
Results
Cedar Hill, TX 75104

Irving Mall Site Work
Renovation - 767,000 SF
Construction
Irving, TX 75062

Salad and Go - Marsh & Walnut Hill / Dallas
New Construction, Infrastructure - 767 SF
Construction
$300,000 CJ est. value
Dallas, TX 75229

Kohls Sephora Renovation #748 / Amarillo
Demolition, Renovation, Infrastructure - 2,500 SF
Pending Verification
$300,000 CJ est. value
Amarillo, TX 79124

O'Reilly Auto Parts Store #29 / Dallas
New Construction, Infrastructure - 7,453 SF
Pending Verification
$1,500,000 CJ est. value
Dallas, TX 75227

Willie Mae Butler Park Improvements - Convert Tennis Court to Basketball - City of Dallas
Renovation, Infrastructure
Conception
$42,000 CJ est. value
Dallas, TX 75210

Last Updated 08/26/2022 02:05 PM
Project Title

Lake June Pump Station and Reservoir Replacement

Physical Address View project details and contacts
City, State (County) Dallas, TX 75201   (Dallas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Lake June Pump Station and Reservoir Replacement, Category Mbe Wbe Construction 19.44% 9.17% Equipment 16.28% 11.45% Supplies 25.34% 8.82% Services 20.41% 13.66% All Pre-proposal Inquiries Shall Be Submitted in Bonfire. Only Written Inquires Submitted in Bonfire Will Receive a Response. Responses Will Be Issued to Plan Holders by Addendum. The Last Day to Submit Pre-proposal Inquiries for This Project Is August 10 at 4:00 Pm Cst. The Mbe/wbe Goals Are Neither Standards Nor Quotas; They Are Goals. Recipients of Financial Assistance Are Not Required to Meet the Fair Share Objectives. They Must, However, Acknowledge That They Are Aware of and Are Actively Pursuing the Fair Share Objectives With Their Procurements. Recipients of Financial Assistance Must Maintain All Records Documenting Compliance With All Applicable Federal and State Requirements. They Are Also Subject to Additional Contract Administration Requirements (40 Cfr, Section 33.302). This Guide Will Cover the Six Good Faith Efforts, Procurement Instructions, and the Twdb's Dbe Review Process This Contract Is Subject to the Environmental Protection Agency's (Epa) Disadvantaged Business Enterprise (Dbe) Program, Which Includes Epa-approved Fair Share Goals Toward Procurement of Minority and Women-owned Business Enterprise (M/wbe) Businesses. Epa Rules Require That Applicants and Prime Contractors Make a Good Faith Effort to Award a Fair Share of Contracts, Subcontracts, and Procurements to M/wbes Through Demonstration of the Six Affirmative Steps. Questions Due Date: Aug 10th 2022, 4:00 PM CDT

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents