Similar Projects
2022 Standpipe Improvements
Infrastructure
Bidding
$340,000 CJ est. value
Martinsburg, NE 68770

Plumbing Services
Alteration
Post-Bid
Omaha, NE

Florence Primary Basin Cathodic Protection Replacement
Infrastructure
Post-Bid
$400,000 CJ est. value
Omaha, NE 68112

Water Main Installation, Section 1
Infrastructure
Post-Bid
$300,000 CJ est. value
Omaha, NE 68102

Sanitary Sewer Rehabilitation
Infrastructure
Results
$689,558 CJ est. value
Grand Island, NE 68801

Mechanical Hydronic Pipe Fitter and Plumber Labor Contract
Term Contract
Post-Bid
Lincoln, NE

CIPP Point Liner Kits - Pipe Repair
Alteration
Post-Bid
Lincoln, NE

Traveling Water Screens Gerald Gentleman Station
Renovation
Post-Bid
$152,563 CJ est. value
Sutherland, NE 69165

Nebraska City Station Unit 2 Spray Dry Absorber (SDA) Lower Cone Replacement, Maintenance Platform and Vessel Coating
Renovation
Results
$4,063,891 CJ est. value
Nebraska City, NE 68410

Columbus Lost Creek Parkway Watermain Extension
Infrastructure
Bidding
$2,339,705 CJ est. value
Columbus, NE 68601

City Office South Drive
Infrastructure
Post-Bid
$140,000 CJ est. value
Crete, NE 68333

SID 341 North Shore 2, Paving, Section 1
Infrastructure
Post-Bid
$440,000 CJ est. value
Papillion, NE 68046

Storm Sewer and Paving System Section II for Sanitary and Improvement District No. 359, Sarpy County
Infrastructure
Results
$3,163,817 CJ est. value
Papillion, NE 68046

500,000 Gallon Water Tower
New Construction, Infrastructure
Bidding
$2,500,000 CJ est. value
Seward, NE 68434

Bessey Nursery Irrigation Boom and Supplies
Alteration
Post-Bid
Halsey, NE 69142

Last Updated 11/16/2022 11:34 PM
Project Title

Southern Sarpy County Regional Wastewater System - Phase 1A

Physical Address View project details and contacts
City, State (County) Springfield, NE 68059   (Sarpy County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $12,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Hawkins Construction Company of Omaha, Nebraska, on behalf of the Sarpy County and Cities Wastewater Agency (Agency), and acting as the Agency's Construction Manager at Risk, is requesting Proposals for the construction of the following project: Southern Sarpy County Regional Wastewater System - Phase 1A The Project includes the following Work: The proposed project area is generally located between the City of Springfield's Wastewater Treatment Facility (SWWTF) at 17305 S Hwy 50 and extends east to the City of Omaha's Papillion Creek Waste Resource Recovery Facility (PCWRRF) located at 15705 Harlan Lewis Road in Bellevue, Nebraska. This proposal package includes three (3) lift stations: Springfield Lift Station The proposed Springfield Creek Lift Station will be constructed south of the City of Springfield at the existing Springfield Wastewater Treatment Facility (SWWTF) located at 17305 S Hwy 50 and would collect sanitary flows from the Springfield Creek and Buffalo Creek Basins. Flows from the Springfield Creek Basin will be conveyed to the lift station from the proposed Springfield Creek interceptor sewer (not part of this project scope). It is anticipated that the proposed interceptor will eventually include existing flows diverted from the SWWTF, which may be abandoned upon final completion and start-up of the Phase 1A projects. Future flows from the Buffalo Creek Basin will be conveyed to the lift station through a future interceptor sewer or force main. The Springfield Creek Lift Station will pump flows to the wet well of the Mitchell Road Lift Station. Mitchell Road Lift Station. The Mitchell Road Lift Station will be constructed on the north side of Mitchell Road between South 108th Street and South 99th Street. The Mitchell Road Lift Station will collect the discharge from the Springfield Creek Lift Station and pump flow east to the transition structure located in the vicinity of South 36th Street and Platteview Road. The transition structure would include a free discharge and pumped flow will transition to gravity flow. Zweibel Creek Lift Station The Zwiebel Creek Lift Station will be constructed north of Platteview Road along South 63rd Street and would collect sanitary flows from the proposed Zwiebel Creek interceptor sewer. The Zwiebel Creek Lift Station would pump flow east to a transition structure. Flow from the Zwiebel Creek Lift Station would be combined with pumped flow from the Mitchell Road Lift Station at the connection point to the dual force mains in the vicinity of South 53rd Street and Platteview Road. The project duration can generally be described as 24 months beginning in August 2022. This project has the following State & Federal Requirements MBE/WBE/DBE Subcontractor Participation Fair Share per 40 CFR 35.6580. - 14% (6% MBE & 8% WBE) E-Verify Federal Immigration Verification Davis Bacon Prevailing Wage & Certified Payroll American Iron and Steel (AIS) Products per FWPCA Section 608 A full listing of the State and Federal Regulations can be found at and is based upon the EPA's listing of "Additional Information on Cross-Cutting Federal Authorities" (http://water.epa.gov/grants_funding/dwsrf/xcuts.cfm) and the EPA's "Cross-Cutting Federal Authorities: A Handbook on Their Application in the Clean Water and Drinking Water State Revolving Fund Programs" (October 2013: http://www2.epa.gov/sites/production/files/2015-08/documents/crosscutterhandbook.pdf) as of October 12, 2015. This list is subject to change based upon the federal authorities of the EPA.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents