Project Title | Southern Sarpy County Regional Wastewater System - Phase 1A |
Physical Address | View project details and contacts |
City, State (County) | Springfield, NE 68059 (Sarpy County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $12,000,000 [brand] Estimate |
Plans Available from | Construction Manager |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Hawkins Construction Company of Omaha, Nebraska, on behalf of the Sarpy County and Cities Wastewater Agency (Agency), and acting as the Agency's Construction Manager at Risk, is requesting Proposals for the construction of the following project: Southern Sarpy County Regional Wastewater System - Phase 1A The Project includes the following Work: The proposed project area is generally located between the City of Springfield's Wastewater Treatment Facility (SWWTF) at 17305 S Hwy 50 and extends east to the City of Omaha's Papillion Creek Waste Resource Recovery Facility (PCWRRF) located at 15705 Harlan Lewis Road in Bellevue, Nebraska. This proposal package includes three (3) lift stations: Springfield Lift Station The proposed Springfield Creek Lift Station will be constructed south of the City of Springfield at the existing Springfield Wastewater Treatment Facility (SWWTF) located at 17305 S Hwy 50 and would collect sanitary flows from the Springfield Creek and Buffalo Creek Basins. Flows from the Springfield Creek Basin will be conveyed to the lift station from the proposed Springfield Creek interceptor sewer (not part of this project scope). It is anticipated that the proposed interceptor will eventually include existing flows diverted from the SWWTF, which may be abandoned upon final completion and start-up of the Phase 1A projects. Future flows from the Buffalo Creek Basin will be conveyed to the lift station through a future interceptor sewer or force main. The Springfield Creek Lift Station will pump flows to the wet well of the Mitchell Road Lift Station. Mitchell Road Lift Station. The Mitchell Road Lift Station will be constructed on the north side of Mitchell Road between South 108th Street and South 99th Street. The Mitchell Road Lift Station will collect the discharge from the Springfield Creek Lift Station and pump flow east to the transition structure located in the vicinity of South 36th Street and Platteview Road. The transition structure would include a free discharge and pumped flow will transition to gravity flow. Zweibel Creek Lift Station The Zwiebel Creek Lift Station will be constructed north of Platteview Road along South 63rd Street and would collect sanitary flows from the proposed Zwiebel Creek interceptor sewer. The Zwiebel Creek Lift Station would pump flow east to a transition structure. Flow from the Zwiebel Creek Lift Station would be combined with pumped flow from the Mitchell Road Lift Station at the connection point to the dual force mains in the vicinity of South 53rd Street and Platteview Road. The project duration can generally be described as 24 months beginning in August 2022. This project has the following State & Federal Requirements MBE/WBE/DBE Subcontractor Participation Fair Share per 40 CFR 35.6580. - 14% (6% MBE & 8% WBE) E-Verify Federal Immigration Verification Davis Bacon Prevailing Wage & Certified Payroll American Iron and Steel (AIS) Products per FWPCA Section 608 A full listing of the State and Federal Regulations can be found at and is based upon the EPA's listing of "Additional Information on Cross-Cutting Federal Authorities" (http://water.epa.gov/grants_funding/dwsrf/xcuts.cfm) and the EPA's "Cross-Cutting Federal Authorities: A Handbook on Their Application in the Clean Water and Drinking Water State Revolving Fund Programs" (October 2013: http://www2.epa.gov/sites/production/files/2015-08/documents/crosscutterhandbook.pdf) as of October 12, 2015. This list is subject to change based upon the federal authorities of the EPA. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |