Similar Projects
Cross Connection Devices
Bidding
Denver, CO

Advance Metering Infrastructure (AMI) System
Bidding
Thornton, CO

2020 Sacwsd Water System Removal and Replacements Phase 1
Post-Bid
Commerce City, CO

2020 SACWSD Water System Removal and Replacements Phase 2
Post-Bid
Commerce City, CO 80022

Water Softening Project 24 Inch Transmission Line
Results
Commerce City, CO

Baseline Waterline and North Tank Drainage Construction Project
Results
Brighton, CO

Buckley AFB, Co - Repair & Replace Fire Hydrants
Post-Bid
$1,000,000 to $5,000,000 est. value
Aurora, CO

36-Inch Gun Club Rd. Pipeline from E. 26th Ave. to E. 56th Ave
Results
$7,500,000 to $8,100,000 est. value
Aurora, CO 80012

Vault and Valve Rehabilitation Program
Post-Bid
$190,000 to $200,000 est. value
Aurora, CO 80012

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

General Pipeline Maintenance Services Standley Lake Pipeline
Post-Bid
Thornton, CO

2020 Hydrant Preventive Maintenance
Results
Less than $75,000 est. value
Commerce City, CO 80022

Reservoir Above Water 72 Inch Vault and East Tee (Prime Contractors)
Post-Bid
Less than $2,000,000 est. value
Aurora, CO

60-Inch Gun Club Road Pipeline From East 6th Avenue to I-70
Results
$2,800,000 to $3,000,000 est. value
Aurora, CO 80012

Aurora Reservoir Above Water 72-Inch Vault - 72" Valve
Post-Bid
Aurora, CO

Reported 12/10/2019 12:00 AM
Project Title

Wise Binney Connection Pipeline

Physical Address View project details and contacts
City, State (County) Aurora, CO 80111   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $19,000,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The WISE Binney Connection Pipeline Project (Project) includes approximately 4.5 total miles of 42-inch pressurized water pipeline and associated appurtenances, 4,000 linear feet of 12-inch pressurized water pipeline and associated appurtenances, and approximately 5 miles of fiber optic conduit and handholes. The project is located in the City of Aurora, Colorado. Once constructed, the Project will convey incoming potable water from a new pump station and treatment facility at the Binney Water Purification Facility (BWPF) to the existing Smoky Hill Tank (SMT).

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents