Similar Projects
Traffic Cone 28" Orange Slim
Post-Bid
Greensboro, NC

Pedestrian Signal Poles
Infrastructure
Post-Bid
Greensboro, NC

Walk Thru Metal Detectors (WTMD)
Results

ADA Pedestrian Push Button Stations
Alteration
Post-Bid
Greensboro, NC

Galvanized Steel Couplings
Alteration
Post-Bid
Greensboro, NC

Copper Clad Ground Rods
Alteration
Post-Bid
Greensboro, NC

Water Meters
Alteration
Post-Bid
Greensboro, NC

2 Chrispin Air Valves Ul 20 Series
Alteration
Post-Bid
Greensboro, NC

Pipe and Tube Fittings
Alteration
Post-Bid
Greensboro, NC

Gutter Broom
Alteration
Post-Bid
Greensboro, NC

3/4 Corporation Stop
Alteration
Post-Bid
Greensboro, NC

Weather Head Aluminum 2"
Alteration
Post-Bid
Greensboro, NC

Ultraviolet Disinfecting Unit
Alteration
Post-Bid
$10,000 to $50,000 est. value

Gutter Brooms
Alteration
Post-Bid
Greensboro, NC

Ductile Iron Slip Joint Pipe
Alteration
Post-Bid
Greensboro, NC

Last Updated 10/12/2022 04:39 AM
Project Title

Jackson Lake Substation - Equipment Upgrade

Physical Address View project details and contacts
City, State (County) High Point, NC 27260   (Guilford County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2022
Bids Due View project details and contacts
Estimated Value $3,636,234 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For the furnishing of the following: Jackson Lake Substation Equipment Upgrade The City reserves the right to reject any or all bids, in whole or in part, as may in the judgment of the Council of the City of High Point, serve its best interest and to waive irregularities and informalities in any bid submitted. No Bid may be withdrawn after the scheduled closing time of receipt of bids for a period of sixty (60) days. Bid Results Schedule I - Substation Enterprises -$921718 Schedule II - R.W. Chapman Company - $142825 Schedule III - Myers Controlled Power - $205186 Schedule IV - Birmingham Control Systems - $196505 Schedule V - Waukesha - $2170000

Details

Division 11 - Equipment, Operation and Maintenance of Equipment, Vehicle Service Equipment, Maintenance Equipment, Unit Kitchens, Residential Equipment, Residential Appliances, Agricultural Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents