Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$460,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$460,000 CJ est. value
Scott, PA 17815

SR 4030 Carter Avenue Bridge
Demolition, New Construction, Infrastructure
Design
$2,041,940 CJ est. value
Indiana, PA 15701

SR 4030 Carter Avenue Bridge
Demolition, New Construction, Infrastructure
Design
$2,041,940 CJ est. value
Indiana, PA 15701

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

23 South West Range Road Improvement
Infrastructure
Post-Bid
Penn Run, PA

AMR Upper Two Lick West, White Township, Indiana County
Results
$500,000 to $1,000,000 est. value
PA

Wearing Material as a Leveling Course
Infrastructure
Results
$135,000 to $150,000 est. value
Saltsburg, PA

Inpatient Behavioral Health Center - Indiana Regional Medical Center
New Construction, Infrastructure - 33,000 SF
Pending Verification
$15,000,000 CJ est. value
Indiana, PA 15701

Broadhead Run Bridge #2
Demolition, New Construction, Infrastructure
Conception
$2,722,286 CJ est. value
Canoe Township, PA 15771

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$2,139,878 CJ est. value
Franklin Township, PA 16001

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

AMR Blacklick Creek Treatment Facility
Renovation
Results
$5,000,000 est. value
PA

Creekside Bridge #1
New Construction, Demolition, Infrastructure
Conception
$515,900 est. value
Creekside, PA 15732

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

Last Updated 11/23/2022 09:36 AM
Project Title

River Valley School District (RVSD) Athletic Facilities Phase 1 Utility Relocations Repairs and Replacements (Storm and Sanitary)

Physical Address View project details and contacts
City, State (County) Blairsville, PA 15717   (Indiana County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,139,216 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 23, 2022. Project is cancelled. No anticipated date for re-bid. Plans call for the construction of a new football field using synthetic turf, a synthetic paved track surface, bleachers with a press box, areas for track and field sports and program buildings. The facilities will include supporting restrooms, concessions, entry gates and pavement walkways. River Valley School District will be accepting bids for the Athletic Facilities Phase 1 Utility Relocation, Repair, and Replacement Project. The project includes replacement of 980 lineal feet of 8" existing Sanitary Main Sewer, 620 lineal feet of new 8" Sanitary Main Sewer Alignment, 90 lineal feet of 6" lateral replacement, two lateral wye and reconnections, seven (7) sanitary manhole replacements, four (4) new sanitary manholes, with a doghouse and flat-top sanitary manhole. The storm culvert relocations will include two new inlet tie-ins to existing, 70 lineal feet of 24" SLCPP, 600 lineal feet of 36" SLCPP, and an end wall structure. Existing sidewalk and curb will be demolished for new Asphalt driveway pavements. Bid BOnd of 10% required. Performance and Payment Bonds 100% required on Award. Warranty Bond for 2 years in 100% of contract required. CLARIFICATION DEADLINE 10/14/2022 8:30 AM

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents