Similar Projects
Fire Station
New Construction
Conception
McQueeney, TX 78123

New Fire Department Headquarters
New Construction
Conception
McKinney, TX

Fire Station 41 Replacement
New Construction
Design
Dallas, TX 75230

Fire Station 6
New Construction
Design
$9,945,000 est. value
Allen, TX 75013

Police Tower 6th Floor Renovation
Renovation
Bidding
Waco, TX 76708

Fire and Rescue Fire Administration and Maintenance Facility
New Construction
Bidding
Sheldon, TX

City of Plainview Police Dept & Fire Station #2
New Construction
Sub-Bidding
Plainview, TX

New Public Safety Training Center
New Construction
Post-Bid
Less than $7,000,000 est. value
Texas City, TX

New Royse City Fire Station No 1
New Construction - 10,500 SF
Post-Bid
$4,350,000 est. value
Royse City, TX 75189

Design-Build for Vehicle Maintenance Facility
Results
Less than $15,800,000 est. value
TX

Seagoville Fire Station 2
New Construction - 5,500 SF
Results
$1,100,000 est. value
Seagoville, TX 75159

Fire Station 6
Construction
League City, TX

Aldine Fire Rescue Station No. 11
New Construction - 15,185 SF
Construction
Houston, TX 77032

EMS & Fire Station 2
New Construction
Design
$4,500,000 est. value
Humble, TX 77338

Duncanville Police Station
Post-Bid
Duncanville, TX 75137

Last Updated 06/24/2021 08:12 AM
Project Title

Fire Training Burn Building Phase I

Physical Address View project details and contacts
City, State (County) Pearland, TX 77584   (Brazoria County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method
Project Status Construction Commenced fourth quarter 2020, Construction Complete as of second quarter 2021
Bids Due View project details and contacts
Estimated Value $1,170,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will entail the construction of a 2,500 sf, two-story structure used to conduct live fire training exercises for the fire department, plus associated site work for paving and utilities in the area immediately around the training structure. The structure will consist of a concrete frame (concrete columns and flat plat concrete slabs) with CMU block infill walls, thermal linings to protect the structural elements for the heat of the training fires, and a galvanized steel exterior stair.

Details

1 Fire/Police Station, 2 Stories Above Grade, 2,500 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents