Similar Projects
Harbor Administration Building Board Hearing Room & Executive Session Room Remodel
Renovation
Bidding
$3,700,000 CJ est. value
Los Angeles, CA 90731

Rio Vista Elementary School Track and Field Project
Infrastructure
Bidding
$545,000 CJ est. value
Santa Clarita, CA 91351

Concrete Repair Program - Phase XI
Infrastructure, Alteration
Post-Bid
$169,000 est. value
West Hollywood, CA 90069

Concrete Cutting Services
Term Contract
Post-Bid
zh, CA 93510

Construction of Concrete Improvements in Residential Streets
Alteration
Results
Cerritos, CA

Place Minor Concrete and Highway Plants
Alteration
Results
$3,850,000 est. value
Los Angeles, CA 90081

Park Walkway Repairs
Infrastructure
Bidding
$260,000 CJ est. value
Claremont, CA 91711

Downtown Visalia Streetlights and Paving Project
Infrastructure, Alteration
Post-Bid

Outdoor Gym Concrete
Alteration
Results
$100,000 est. value
Lancaster, CA 93536

2022-23 Thermoplastic Lane Striping Program
Infrastructure
Bidding
$170,000 CJ est. value
Santa Clarita, CA 91355

Annual Residential Street Rehabilitation Project (Phase 2B)
Term Contract
Post-Bid
Compton, CA 90221

Install Plants, Irrigation, and Prepare and Stain AC and Concrete
Alteration
Results
$830,000 est. value
City of Industry, CA 91714

Portland Cement Concrete Materials (As-Needed)
Term Contract
Post-Bid
$35,000 est. value
Palmdale, CA

Prepare and Stain Concrete
Alteration
Results
$640,000 est. value
Los Angeles, CA

RFQ Contractor - Belmont Beach and Aquatics Center
Demolition, New Construction, Infrastructure - 90,480 SF
Post-Bid
$70,000,000 CJ est. value
Long Beach, CA 90803

Last Updated 04/29/2023 11:01 PM
Project Title

FY 22-23 HSIP Pedestrian Safety Enhancements

Physical Address View project details and contacts
City, State (County) Santa Clarita, CA 91321   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $223,160 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project will improve and enhance pedestrian safety near Placerita Junior High and William S. Hart High School. A total of 9 intersections will be improved, which includes installing continental crosswalks at 6 intersections, upgrading 2 existing intersections from standard to school continental crosswalks, and installing 2 curb extensions at 1 intersection. The intersections include: Orchard Village Road/ 16th Street, Kansas Street/ Oak Street, Newhall Avenue/ 15th Street, Newhall Avenue/ 14th Street, Chestnut Street/ 16th Street, Chestnut Street/ 15th Street, Walnut Street/ 16th Street, Walnut Street/ 15th Street, and Walnut Street/ 14th Street. The project includes, but is not limited to, preparation and approval of all required documents and permits, removal and installation of signage and striping, and installation of curb extensions at one intersection, including removal and installation of three curb ramps, curb and gutter, sidewalk, base material, and AC paving Project is included in the City of Santa Clarita's FY 2022 -2027 Capital Improvement Plan (CIP). Per the owner, as of October 3, 2022, the signing and striping portion of the project is being designed by in-house teams and they are working with an engineer on the curb extension design portion. The owner states that construction is anticipated in the summer of 2023. Question Acceptance Deadline: 04/12/2023 02:00 PM EDT Questions are submitted online: Yes General Requirements Certified Payroll Contractors License Required Installation Required Insurance Required Prevailing Wage Required

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents