Similar Projects
Painting at Tara Oaks Elementary School
Post-Bid
Collierville, TN 38017

Gym Floor Replacement at Altruria Elementary
Post-Bid
Bartlett, TN 38134

Bass Pro Shops at the Pyramid Facade Upgrade
Results
Memphis, TN 38105

Ellendale Elementary - Finish Upgrades 2021
Results
Bartlett, TN 38135

Flooring
Post-Bid
Collierville, TN 38017

Renovate Hardwood Floors
Alteration
Results
Bartlett, TN 38135

Floor Replacement
Term Contract
Post-Bid
$100,000 to $250,000 est. value
Memphis, TN 38118

Sandblast and Paint Barge
Alteration
Results
Memphis, TN 38109

SWC 102 Building Materials
Term Contract
Post-Bid

Mitchell HS Painting
Term Contract
Results
Memphis, TN 38109

Well and Pump Sandblasting & Painting
Alteration
Post-Bid
Germantown, TN

Farrisview Transfer Building Floor Repair
Alteration
Results
$2,471,079 est. value
Memphis, TN 38118

Overhead Storage Tank Painting for Arlington-LNG
Infrastructure
Post-Bid
$50,000 est. value
Arlington, TN 38002

Well & Pump Rehabilitation Sandblasting & Painting
Alteration
Post-Bid
Germantown, TN

LJS Humes MS Gymnasium Wood Floor Replacement
Alteration
Post-Bid
Memphis, TN 38107

Reported 03/11/2022 12:00 AM
Project Title

Collierville MS Painting and Flooring

Physical Address View project details and contacts
City, State (County) Collierville, TN 38017   (Shelby County)
Category(s) Single Trades
Sub-Category(s) Flooring, Painting
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Prepare all surfaces for the application of paint in accordance with manufacturer’s recommendations. Protect fixtures, items, furniture, etc. not to be painted. Paint all previously painted interior and exterior surfaces according to the specifications and drawings. Clean all paint splatter and remove all debris, trash, etc. from the premises. Collierville Schools will provide carpet tiles, LVT, and flooring adhesives. 1. Move furniture and shelving as needed to complete the project. Details will be discussed during the PreBid Meeting. 2. Remove and dispose of existing carpet, VCT, and cove base without damaging walls. 3. Prepare substrate for application of new LVT, carpet tiles and cove base. 4. Install LVT, carpet tiles, and transition strips as specified herein. Color and installation pattern to be specified by Collierville Schools for each location. 5. Provide and install cove base as specified herein. 6. This is a turn-key project which must be completed by July 15, 2022.

Details

Division 09 - Finishes, Flooring, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents