Similar Projects
Waste and Recycling Services
Term Contract
Sub-Bidding
Wheaton, IL 60187

Parking Garages Custodial Services
Term Contract
Sub-Bidding
Glen Ellyn, IL 60137

QBS DOIT Professional Fiber Engineering Services
Renovation, Infrastructure
Post-Bid

Fuel Site and Storage Tank Inspections and Repairs
Term Contract
Post-Bid
Naperville, IL

Aerial Spraying of Aquatic Glyphosate Herbicide
Term Contract
Results

Classroom Locksets
Term Contract
Results
$199,600 CJ est. value
Naperville, IL 60540

Tree Trimming, Tree Removal and Disposal of Debris
Term Contract
Sub-Bidding
Aurora, IL 60504

Large Diameter Water Meter Testing and Repair/Replacement Services
Term Contract
Post-Bid
Naperville, IL

Snow and Ice Removal Services for City Sidewalks
Term Contract
Results
$6,450 CJ est. value
Wheaton, IL 60187

Mosquito Abatement Services
Alteration
Post-Bid
Downers Grove, IL

Snow and Ice Removal Services for Parking Lots and Garages
Term Contract
Results
Wheaton, IL 60187

Rental/Service of Portable Toilets for Various City Divisions
Alteration
Post-Bid
Aurora, IL

Streetlight Maintenance Services
Term Contract
Results
$62,408 CJ est. value
Lisle, IL 60532

Job Order Contracting
Term Contract
Post-Bid

Water System Leak Detection Services
Term Contract
Post-Bid
Woodridge, IL 60517

Last Updated 03/17/2023 06:06 AM
Project Title

IL Route 390 Tollway Clean and Televise Drainage System US 20 Lake Street to IL 19 Irvin

Physical Address View project details and contacts
City, State (County) Roselle, IL 60172   (DuPage County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The location of services to be performed on this contract is the IL Route 390 Tollway between Mile Post 5.8 and 7.7 in Cook County and DuPage County, Illinois. The scope of the work shall consist of cleaning and televising storm sewers, ditch cleaning in areas noted as necessary for storm cleaning and televising work, seeding areas disturbed by ditch cleaning activities and Maintenanceof Traffic during construction operations. The work to be done under this contract shall be started on or about May 29, 2023. All work under this contract shall be completed by October 9, 2023. Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention4802D.4876_Questions@docs.e-builder.net, to be received no later than 2:00 p.m. local time on January 16, 2023.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents