Similar Projects
2023 Lighthouse Drive Reconstruction
Infrastructure
Bidding
$892,265 CJ est. value
Fond du Lac, WI 54935

Sprinkler Nitrogen Generator Addition
Renovation
Bidding
$50,000 CJ est. value
Madison, WI 53703

Crack Filling
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Lake Geneva, WI 53147

Honey Creek Reach 4 Concrete Channel Repair near West Beloit Road Bridge in West Allis
Alteration
Post-Bid
Milwaukee, WI

Concrete Blocks For New South Landfill
Alteration
Post-Bid
WI

Polymer Concrete Vaults
Term Contract
Results
Milwaukee, WI

2021 Miscellaneous Concrete Repairs
Alteration
Results
$20,000 est. value
Milton, WI

Entrance and Terrace Renovation University Center University of Wisconsin - River Falls - GPC
Renovation
Construction
$359,817 CJ est. value
River Falls, WI 54022

Chiller #1 Overhaul Heating & Cooling Plant
Renovation
Construction
$96,975 CJ est. value
Kenosha, WI 53144

Firing Range Warming Building Replacement
Demolition, New Construction, Infrastructure - 1,920 SF
Bidding
$226,700 CJ est. value
Fox Lake, WI 53933

LE Phillips Memorial Library - Concrete Polishing Bid Package 05
Alteration
Post-Bid
Eau Claire, WI 54701

Jones Island Water Reclamation Facility Aeration Basin Concrete Rehabilitation
Alteration
Results
Milwaukee, WI 53207

Install Storm Sewer Piping
Infrastructure, Renovation
Construction
$178,689 CJ est. value
Fort McCoy, WI 54656

Food Service Trayline Conveyor Replacement
Renovation
Bidding
$200,000 CJ est. value
Madison, WI 53704

Beloit Readiness Center Construct Trash Enclosure
Alteration
Post-Bid
Beloit, WI 53511

Last Updated 01/11/2023 03:23 PM
Project Title

South Parking Lot Reconstruction (Rebid)

Physical Address View project details and contacts
City, State (County) Granton, WI 54436   (Clark County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $338,777 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work for which bids are asked includes the following: Parking lot and drainage improvements including HDPE pipe, select crushed base aggregate dense, concrete sidewalk, asphalt pavement, bio-retention basin, and restoration. The Contractor may not begin construction on the project until the school year ends. The earliest start date for construction is May 29, 2023. The anticipated substantial completion date is August 18, 2023 and final completion date is September 8, 2023. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. BIDDER is required to deliver the original certified check or bid bond within the 72 hours of bid opening to MSA Professional Services, Inc., Attn: Chad Grundemann, 146 North Central Avenue, Suite 201, Marshfield, WI 54449. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. Pursuant to Section 66.0903, Wisconsin Statutes, the minimum wages to be paid on the project shall be in accordance with the wage rate scale established by local wage rates. OWNER reserves the right to waive any informalities or to reject any or all bids.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents