Similar Projects
I-21-4835 Tri-State Tollway (I-294) Roadway and Bridge Reconstruction Northbound I-294/ I-290/I-88
Renovation, Infrastructure
Bidding
$900,000 est. value
Hinsdale, IL

2022 Road Construction Season - Asphalt
Infrastructure
Bidding
$140,000 est. value
Lisle, IL

Pavement Resurfacing
Post-Bid
Burr Ridge, IL

2021 MFT Road Program
Post-Bid
Burr Ridge, IL

2020 Rebuild Illinois Bonds Program
Results
Less than $1,450,000 est. value
Darien, IL

Resurfacing Clarendon Hjills Road between 91St Street and 79th Street within Downers Grove Township in Dupage County
Results
IL

Asphalt Repair Project District Wide
Infrastructure
Bidding
$200,000 est. value
Wheaton, IL

Repair Roads and Concrete
Post-Bid
$500,000 est. value
Glen Ellyn, IL

Resurfacing Abbeywood Drive and Green Trails Drive from Naper Boulevard to College Road in the Village of Lisle
Results
Lisle, IL 60532

2022 Road Construction Season - Crack Sealing
Infrastructure
Bidding
$140,000 est. value
Lisle, IL

2021 Crack Sealing Bituminous Pavement
Post-Bid
Bloomingdale, IL

(3.157-Mile) Crack and Joint Sealing Project on IL 64 (North Avenue) from IL 53 (Rohlwing Road) to Villa Ave
Results
Addison, Lombard, Villa Park, IL 60101

Width Resurfacing W/HMA Surf
Infrastructure
Bidding
$500,000 est. value
Lombard, IL

Pavement Resurfacing
Post-Bid
Naperville, IL

Pavement Widening and Reconstruction, Sidewalks, Multi-Use Path, Storm Sewer, Traffic Signals
Results
Naperville, IL 60540

Last Updated 05/18/2022 04:56 PM
Project Title

2022 Street Improvement

Physical Address View project details and contacts
City, State (County) Bloomingdale, IL   (DuPage County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Which consists of HMA grinding and overlay, pcc sidewalk, combination concrete curb and gutter, storm sewer adjustments, pavement marking, sodding, and any other work for a total distance of 4.97 miles.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents