Similar Projects
Freeport Art Museum Renovation
Renovation
Conception
Freeport, IL 61032

Steam Locomotive Museum
Build-Out - 400,000 SF
Conception
Silvis, IL

Bally's Casino
New Construction - 1,000,000 SF
Design
$1,800,000,000 est. value
Chicago, IL 60654

Northside Cultural District
New Construction, Addition, Build-Out - 206,280 SF
Design
$10,000,000 CJ est. value
Chicago, IL 60630

RFQ Design - Reuse of Former Watchman House Located at 1826 W. 91st Street in Dan Ryan Woods
Renovation
Bidding
$223,575 CJ est. value
Chicago, IL 60643

Tinker Swiss Cottage Museum Roof Replacement
Renovation
Sub-Bidding
$104,000 CJ est. value
Rockford, IL 61101

Watts Plumbing Supplies
Term Contract
Sub-Bidding
Chicago, IL 60604

BRL MEP Upgrades - Division 01
Renovation
Post-Bid
Chicago, IL 60612

National Public Housing Museum
Renovation - 22,272 SF
Post-Bid
$5,000,000 to $7,000,000 est. value
Chicago, IL 60607

Municipal Center Valve Replacement
Renovation
Results
Glenview, IL 60026

BRL MEP Upgrades - Division 2, 3, 4, 5
Renovation
Results
Chicago, IL 60612

Pioneer Schoolhouse Renovation
Renovation
Construction
Bourbonnais, IL 60914

RFQ Design - Phase 1 and Phase 2 Architectural and Engineering Services for the Freeport Art Museum Renovations
Renovation
Conception
Freeport, IL 61032

Museum Exhibit Hall Repair -- Rock Island Arsenal
Renovation
Design
$250,000 to $500,000 est. value
Rock Island, IL 61299

Hydrants, Hydrant Parts & Related Materials
Term Contract
Post-Bid
Addison, IL

Last Updated 08/16/2022 12:03 PM
Project Title

Replace Plumbing - Capitol Complex (Phase 1)

Physical Address View project details and contacts
City, State (County) Springfield, IL 62704   (Sangamon County)
Category(s) Entertainment/Recreation, Single Trades
Sub-Category(s) Museum, Plumbing
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $21,382,860 [brand] Estimate
Plans Available from Plumbing Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Pre-Bid meeting is mandatory and will be onsite. All work will be awarded under a single prime construction contract. A Project Labor Agreement is applicable to this project.

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents