Similar Projects
Hemphill Creek 12-inch, 24-inch, 27-inch Wastewater Main - 564 - City of San Marcos
Infrastructure
Conception
$8,400,000 CJ est. value
San Marcos, TX 78666

Hemphill Creek 12-inch, 24-inch, 27-inch Wastewater Main - 564 - City of San Marcos
Infrastructure
Conception
$8,400,000 CJ est. value
San Marcos, TX 78666

Luxe of Buda
New Construction, Infrastructure - 7,066 SF
Design
$750,000 CJ est. value
Buda, TX 78610

A New Accessible Entrance Ramp / San Marcos Treatment Center
Infrastructure
Design
$50,000 est. value
San Marcos, TX 78666

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Loop 82 and Bobcat Stadium
Infrastructure
Post-Bid
$68,931 CJ est. value
San Marcos, TX 78666

Loop 82 and Bobcat Stadium
Infrastructure
Post-Bid
$68,931 CJ est. value
San Marcos, TX 78666

San Marcos Parking Lot
Results
$73,975 est. value
San Marcos, TX 78666

150 Business Park Public/Private Wastewater Line
Results
Kyle, TX 78640

Sunfield WWTP Expansion to 0.99 MGD - Package 3A
Addition, Demolition, Renovation, Infrastructure
Construction
$25,000,000 CJ est. value
San Marcos, TX 78666

Sunfield WWTP Expansion to 0.99 MGD - Package 3A
Addition, Demolition, Renovation, Infrastructure
Construction
$25,000,000 CJ est. value
San Marcos, TX 78666

Montage Mixed-Use / South Lamar
New Construction, Infrastructure - 310,661 SF
Pending Verification
$66,500,000 CJ est. value
Austin, TX 78704

Z'Tejas - Dry River District / Kyle
New Construction, Infrastructure - 4,725 SF
Pending Verification
$2,500,000 CJ est. value
Kyle, TX 78640

Harris Hill Road Water Line - 660 - City of San Marcos
Infrastructure
Conception
$2,350,000 CJ est. value
San Marcos, TX 78666

Last Updated 12/13/2022 02:03 PM
Project Title

Midtown Drainage Improvement Project

Physical Address View project details and contacts
City, State (County) San Marcos, TX 78666   (Hays County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $190,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Includes but is not limited to the installation of a sidewalk drain inlet at Southeast corner of IH-35 and Aquarena Springs Drive, regarding the existing drainage channel from Southeast corner of IH-35 and Aquarena Springs to approximately 300 feet downstream, construction of a new detention pond south of Davis Lane, and construction of the River Road Pavement and Bank Stabilization. Bidders must submit a cashier's check, certified check, or acceptable bidder's bond with their bid in the amount of five percent (5%) of the bid submitted. Award is scheduled for the February 7, 2023, City Council meeting at 6:00 p.m. or any subsequent time unless otherwise rescheduled. Questions must be submitted in writing to the City of San Marcos Purchasing and Contracting Division only at rshelton@sanmarcostx.gov. Please reference the solicitation number when corresponding The estimated construction cost is $2,800,000 The scope of the project includes installation of a sidewalk drain inlet at Southeast corner of IH35 and Aquarena Springs Drive, regarding the existing drainage channel from Southeast corner of IH-35 and Aquarena Springs to approximately 300 feet downstream, construction of a new detention pond south of Davis Lane, and construction of the River Road Pavement and Bank Stabilization. The objectives of the Community Development Block Grant Disaster Recovery (CDBG-DR) grant funded project are to reduce the flooding at the intersection of IH-35 and Aquarena Springs to improve the safety of the San Marcos Rehabilitation and Healthcare facility and to reduce the overflow from the gravel pit to Walmart and the mobile home park. The estimated construction cost is $2,800,000. 0600-024-01

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents