Similar Projects
Columbia Boulevard Upsize - City of Saint Helens
Infrastructure
Conception
$2,800,000 CJ est. value
Saint Helens, OR 97051

Saint Helens Way Pressure Zone Boundary Modification - City of Saint Helens
Infrastructure
Conception
$400,000 CJ est. value
Saint Helens, OR 97051

Crystal Creek (Miami-Foley) Bridge
Infrastructure, Renovation
Design
$2,533,000 CJ est. value
Saint Helens, OR 97051

US 30: Clatskanie River Bridge
Renovation, Infrastructure
Design
$250,932 CJ est. value
Deer Island, OR 97054

RFP D/B - Smith Road Pump Station
Infrastructure
Bidding
$900,000 CJ est. value
Scappoose, OR 97056

Design-build Services for Replacement OF 2.0 MG RESERVOIR
Infrastructure
Bidding
$2,000,000 CJ est. value
Trenholm, OR 97051

Meissner New Communications Site Construction
Infrastructure
Post-Bid
$510,000 est. value
Deer Island, OR 97054

WWTP Influent Flowmeter Project
Infrastructure
Post-Bid
$129,800 CJ est. value
Saint Helens, OR 97051

Columbia County Emergency Culvert Replacements
Infrastructure
Results
$3,449,000 CJ est. value
Rainier, OR 97048

C Street Sewer System Improvements Project
Infrastructure
Results
$769,188 CJ est. value
Columbia City, OR 97018

Basin 5 Pipeline Upsize - City of Saint Helens
Infrastructure
Conception
$4,500,000 CJ est. value
Saint Helens, OR 97051

RFP DB - Replacement of 2.0 Mg Reservoir
Infrastructure
Bidding
$1,000,000 CJ est. value
Saint Helens, OR 97051

St Helens Middle School Site Accessory Sheds
Infrastructure
Post-Bid
$315,000 CJ est. value
Saint Helens, OR 97051

St Helens HS - Phase 2 Asbestos Abatement Contractor Bid
Term Contract, Infrastructure
Results
$32,948 CJ est. value
Saint Helens, OR 97051

Basin 4 Pipeline Upsize and Reroute - City of Saint Helens
Infrastructure
Conception
$3,600,000 CJ est. value
Saint Helens, OR 97051

Last Updated 06/16/2023 08:03 PM
Project Title

Lousignont Creek Salmon Habitat Improvement Project

Physical Address View project details and contacts
City, State (County) Trenholm, OR 97051   (Columbia County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Environmental, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $495,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bidders are solely responsible for ensuring that the Upper Nehalem Watershed Council receives the proposal. Bidders shall familiarize themselves with this entire Bid Document. All questions and comments about this solicitation shall be directed in WRITING via Email to: maggie@nehalem.org PROJECT BACKGROUND Upper Nehalem Watershed Council (UNWC) working in partnership with The Oregon Department of Forestry (ODF), Oregon Department of Fish and Wildlife (ODFW) to improve anadromous fish habitat and natural stream functions within high priority aquatic anchor habitats identified within two reaches of a productive Coho salmon bearing tributary of the Upper Nehalem River Basin. Each of the stream reaches are below ODFW habitat benchmarks for Large Wood Debris (LWD) that typify optimal habitat utilized by salmonids. Strategic placement of LWD structures within the proposed salmon anchor habitats will enhance natural stream functions, watershed processes, and provide quality habitat longterm for its recipient species. The project and its benefits for salmonids relies heavily on the "anchor habitat strategy", which seeks to identify, protect, and restore the stream reaches within a watershed that are most capable of supporting Coho across the full spectrum of their freshwater residency, including egg incubation, rearing, refuge, smolting, and spawning. SCOPE OF WORK This ITB is to place 19 LWD structures in 2.1 miles of Lousignont Creek. LWD Structures will average 4 trees split into 2-3 logs (May use a whole tree if small). that will be pulled from the adjacent uplands. Trees have been donated from ODF and Contractors are only allowed to use previously approved and marked trees (see map). All work must be completed in 2023 during the permissible season. All questions related to the bid are due through email only by June 15,2023

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents