Similar Projects
Boiler Maintenance and Repair Services
Term Contract
Bidding
Phoenix, AZ

Annual Water Treatment Media Regeneration Services
Term Contract
Bidding
Tucson, AZ

Job Order Contract Mechanical and Plumbing Services
Term Contract
Post-Bid
Mesa, AZ 85211

VA Tucson Upgrade Water Infrastructure System
Post-Bid
$2,000,000 to $5,000,000 est. value
Tucson, AZ 85723

Purchase & Installation of Shower Units / Water Heaters
Results
Douglas, AZ 85607

Pre-Qualify Electrical and Mechanical Equipment Contractors
Results
Green Valley, AZ

VA Tucson Replace Cooling Towers Building 80
Post-Bid
$500,000 to $1,000,000 est. value
Tucson, AZ 85723

Safford K-8 School Boiler and Chiller Replacement
Results
Less than $604,872 est. value
Tucson, AZ 85701

Mechanical Bar Screen Replacement
Post-Bid
Sierra Vista, AZ 85635

Pueblo High School Gym Water Heater Replacement
Results
Less than $50,000 est. value
Tucson, AZ 85713

Chiller Plant And Water Tower Maintenance And Repair
Post-Bid
Glendale, AZ

Maintenance and Repair Services, for Chilled Water Central Plants, Related Equipment and Boilers
Results
Less than $395,000 est. value
Glendale, AZ

PM for Sterizone Sterilization System VP4 and ON2 Oxygen Concentrators
Post-Bid
Phoenix, AZ 85016

Collection System Odor and Corrosion Control
Results
Chandler, AZ 85225

Annual Water Treatment Media Regeneration Services
Term Contract
Post-Bid
Tucson, AZ 85704

Last Updated 04/14/2021 09:21 AM
Project Title

Carson JR High School P.E. Hot Water Boiler Replacement

Physical Address View project details and contacts
City, State (County) Mesa, AZ 85201   (Maricopa County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Bids for quotes to repair/replace the current Boiler System in the Physical Education locker rooms for servicing both girls and boys locker rooms at Carson JR High School. 2. Existing boilers and water storage tanks to be removed and all water lines, gas lines and electrical to capped in a safe manner for removal of boiler and tank.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boiler Feedwater Equipment, Boiler Feedwater Pumps.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents