Similar Projects
Gary Sanitary District 27th and Chase Pump Station Force Main Replacement - Section 219, Gary, Lake County, Indiana (USACE Acquisition)
Design
$1,000,000 to $5,000,000 est. value
Gary, IN

Tillman/Calhoun Lift Station improvements
Bidding
Fort Wayne, IN

Division I – Water Booster Station Replacement and Water Main Additions
New Construction, Infrastructure
Bidding
Carbon, IN

Water Utility Improvements, Division "C" - Phase 3
Post-Bid
Crown Point, IN 46307

Lake Station Crossroads Lift Station Replacement, Lake Station, Lake County, Indiana (Usace Acquisition)
Post-Bid
$1,000,000 to $5,000,000 est. value
Lake Station, IN

Hague Road and Allisonville Road Lift Stations Improvements
Results
$2,000,000 est. value
Fishers, IN 46038

ARV & Pump Station & Force Main Replacement
Results
Clarksville, IN 47129

Perry Crossing Lift Station Rehabilitation
Post-Bid
Sellersburg, IN

Daylight South Lift Station Rehab
Results
Evansville, IN 47708

Truesdell Lift Station and Sewer Extension
Post-Bid
La Porte, IN 46350

Lakeside Sewer Relocation
Results
La Porte, IN 46350

Cane Run Flood Control Pumping Station 5
Post-Bid
$5,000,000 to $6,000,000 est. value
Jeffersonville, IN

Perry Lakes Lift Station Improvements
Results
Fort Wayne, IN 46802

Schoolview Drive Lift Station Improvements
Post-Bid
Rochester, IN

Heaton Lake Lift Station Upgrades
Results
Goshen, IN 46526

Reported 06/30/2021 12:00 AM
Project Title

Lake Station Crossroads Lift Station Replacement - Section 219

Physical Address View project details and contacts
City, State (County) Lake Station, IN   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT INFORMATION: Under the contract, the contractor will replace the exisiting crossroad lift station. The Crossroads Lift Station project includes construction of a new Crossroads Lift Station upsized to 1,600 gallons per minute; provide and install new electrical and control panels at least 2 feet above the 100-year flood elevation; provide and install new emergency generator; and provide and install new electrical building.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents