Similar Projects
Right of Way - US060
Infrastructure
Conception
$2,192,525 CJ est. value
Bluejacket, OK 74333

Bridge and Approaches - US069
Infrastructure
Conception
$1,871,156 CJ est. value
Vinita, OK 74301

Utilities - US 60
Infrastructure
Design
$992,109 CJ est. value
Bluejacket, OK 74333

Utilities - US 60
Infrastructure
Design
$992,109 CJ est. value
Bluejacket, OK 74333

Bridge and Approaches and Bridge Rehabilitation US-69
Infrastructure
Bidding
$2,500,000 CJ est. value
Big Cabin, OK 74332

Bridge and Approaches - County Road (EW-300)
Infrastructure
Bidding
$1,500,000 CJ est. value
Vinita, OK 74301

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Replacing Water Line in the 300 and 400 Blocks of North Gunter Street
Infrastructure
Post-Bid
$400,000 est. value
Vinita, OK 74301

Resurface (Asphalt) - SH-10
Infrastructure
Results
$1,415,000 CJ est. value
Welch, OK 74369

WWTP Lift Station and Sanitary Sewer Improvements
Infrastructure
Results
$1,097,718 CJ est. value
Welch, OK 74369

Storage and Food Outreach Space - Cherokee Nation
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Vinita, OK 74301

American Heartland Theme Park & Resort / Vinita
New Construction, Infrastructure
Pending Verification
$2,000,000,000 CJ est. value
Vinita, OK 74301

Bridge Rehabilitation - US069
Infrastructure
Conception
$3,811,000 CJ est. value
Vinita, OK 74301

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Vinita Public Library ADA Renovations to an Existing Facility
Infrastructure, Renovation
Post-Bid
$300,000 CJ est. value
Vinita, OK 74301

Last Updated 09/26/2023 02:37 AM
Project Title

Big Cabin Force Main Relocation Project

Physical Address View project details and contacts
City, State (County) Big Cabin, OK 74332   (Craig County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $656,286 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall receive and accept the compensation as herein provided in full payment for furnishing all labor, materials, tools, equipment, and incidentals; for performing all work contemplated and embraced underthe contract; for all loss or damage arising out of the nature of the work or from the action of the elements; for any unforeseen defects or obstructions which may arise or be encountered during the prosecution of the work, and before its final acceptance by the Engineer; for all risks of every description connected with the prosecution of the work; for all expenses incurred by or in consequence of suspension or discontinuance of such prosecution of the work as herein specified; for any infringement of patents, trademarks, or copyrights and for completing the work in an acceptable manner according to the specifications. Bid result:- Schedule One - Stronghand, LLC -$223,722.01 Schedule Two - Stronghand, LLC -$432,564.26

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents