Similar Projects
Mills/Jarrett Building - 1st and 2nd Floor Lighting Improvement(s)
Renovation
Design
$125,000 CJ est. value
Columbia, SC 29201

East Water Meter Project
Infrastructure
Design
$300,000 CJ est. value
York, SC 29745

Electrical Upgrades to the R.L. Jones Center
Renovation
Bidding
$250,000 CJ est. value
Mount Pleasant, SC 29464

Electrical Work Task Order Contracting
Term Contract
Sub-Bidding
Bluffton, SC 29910

Olympian 150KW Generator Re-Bid
Renovation
Sub-Bidding
Pelzer, SC 29669

Expansion Of Town Wireless Camera System
Alteration
Post-Bid
$150,000 est. value
Surfside Beach, SC

Williams-Brice Stadium (WBS) - Support for Display Boards and Sound System - Amp Room Electrical Work
Alteration
Post-Bid
$50,000 to $75,000 est. value
Columbia, SC 29201

MTC Regional Training Institute Lighting Upgrades
Results
$100,000 to $300,000 est. value
Eastover, SC 29044

SCC - TRB Generator for Fire Pumps
Alteration
Results
$45,000 to $55,000 est. value
Duncan, SC 29334

Marquee Signage Replacement
Renovation
Construction
$102,182 CJ est. value
Graniteville, SC 29829

PS090 & PS096 Electrical Control Cabinets
Renovation
Sub-Bidding
$350,000 CJ est. value
Moncks Corner, SC 29461

Hydroponic Lab Foundation and Plaza
Renovation, Infrastructure, Alteration
Post-Bid
$75,000 to $90,000 est. value
Hartsville, SC 29550

SCC - TRB Exterior Lighting Upgrades
Alteration
Results
$25,000 to $39,000 est. value
Duncan, SC 29334

Electrical Maintenance One Time Service
Term Contract
Sub-Bidding
Columbia, SC 29209

Electrical Supplies and Equipment - Percentage Discount Program
Term Contract
Post-Bid
Taylors, SC

Last Updated 10/07/2023 03:31 AM
Project Title

Multipurpose Field Lighting

Physical Address View project details and contacts
City, State (County) Dillon, SC 29536   (Dillon County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Dillon is seeking proposals from Sports Field Lighting Professionals interested in contracting to provide Sports Field Lighting improvements to the City of Dillon Sports Complex Multipurpose Fields in Dillon, SC. The City of Dillon intends to select one (1) qualified lighting professional to provide full-service materials and installation for the replacement of existing lights and poles along with adding additional lights and poles for an additional playing field The deadline for the submission of any and all questions and inquiries concerning this RFP is October 24 at 3:00 PM. All questions must be directed to Glen Wagner via email (gwdillon@bellsouth.net). The City reserves the right to select the proposal that it may determine to be in the best interest of the City. The City also reserves the right to reject any and all proposals, including that of the selected Team if satisfactory contract negotiations cannot be concluded. Information regarding the LED lighting system being proposed. 2. Price of the overall LED Lighting system and associated electrical work, broken down by key components. 3. Information on warranties associated with the LED lighting system materials and installation. 4. Information on Operation and Maintenance support from the lighting professional after installation. 5. Information regarding the lighting professional's history including, but not limited to, location of the main and satellite offices, length of time in business, annual design workload for the past three (3) years. 6. The lighting professional's experience in designing and installing Sports field lighting on projects of similar size, including the name of each project, dates of completion, locations, owners, and a brief description of the project, the budget of the project, and whether there were any cost overruns. Please provide at least three (3) previous projects, but no more than five (5), completed within the past 6 years

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents